Difference between revisions of "Bander power station"

From SourceWatch
Jump to navigation Jump to search
(fixed map ref)
(tweaked status)
Line 5: Line 5:
 
{{#display_point:14.33556, 80.14944|width=500|height=400|type=satellite|zoom=13}}
 
{{#display_point:14.33556, 80.14944|width=500|height=400|type=satellite|zoom=13}}
 
==Background==
 
==Background==
'''Bander power station''' is a coal-fired power station in Andhra Pradesh being developed in two phases by [[Thermal Powertech Corporation]]. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW.<ref name=Details/>
+
'''Bander power station''' is a coal-fired power station in Andhra Pradesh being developed in two phases by [[Thermal Powertech Corporation]]. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW. Although the Central Electricity Authority lists the plant for 2014 completion, it is not clear that the project has actually begun construction.<ref name=Details/>  
 
==Project Details==
 
==Project Details==
 
'''Sponsor:''' [[Thermal Powertech Corporation]]<br>
 
'''Sponsor:''' [[Thermal Powertech Corporation]]<br>
 
'''Location:'''  Pyanampuram Village (about 6 km north of Krishnapatnam port), Mutukur Mandal, SPS Nellore District of Andhra Pradesh<ref>[http://www.tpcil.com/map.html Wikimapia,] accessed November 16, 2012</ref><br>
 
'''Location:'''  Pyanampuram Village (about 6 km north of Krishnapatnam port), Mutukur Mandal, SPS Nellore District of Andhra Pradesh<ref>[http://www.tpcil.com/map.html Wikimapia,] accessed November 16, 2012</ref><br>
 
'''Coordinates:''' 14.33556, 80.14944<br>
 
'''Coordinates:''' 14.33556, 80.14944<br>
'''Status:''' Construction<br>
+
'''Status:''' Advanced development<br>
 
'''Nameplate capacity:''' 1320 MW (Phase-I 660 MW; Phase-II 660 MW)<br>
 
'''Nameplate capacity:''' 1320 MW (Phase-I 660 MW; Phase-II 660 MW)<br>
 
'''Type:''' Supercritical<br>
 
'''Type:''' Supercritical<br>

Revision as of 15:00, 16 November 2012

{{#badges: CoalSwarm|Navbar-Indiacoal}}

Bander power station is a coal-fired power station currently being developed in Andhra Pradesh. It is also known as Pynampuram Thermal Power Project.

Background

Bander power station is a coal-fired power station in Andhra Pradesh being developed in two phases by Thermal Powertech Corporation. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW. Although the Central Electricity Authority lists the plant for 2014 completion, it is not clear that the project has actually begun construction.[1]

Project Details

Sponsor: Thermal Powertech Corporation
Location: Pyanampuram Village (about 6 km north of Krishnapatnam port), Mutukur Mandal, SPS Nellore District of Andhra Pradesh[2]
Coordinates: 14.33556, 80.14944
Status: Advanced development
Nameplate capacity: 1320 MW (Phase-I 660 MW; Phase-II 660 MW)
Type: Supercritical
Projected in service: Phase-I May 2014; Phase-II August 2014[3]
Coal Type:
Coal Source: Imported coal will be transported by ship to Krishnapatnam Port. Indigenous coal will be brought by rail from Ib Valley/Talcher to Paradip/ Dhamra Port and then transported by sea to Krishnapatnam Port[1]
Estimated annual CO2: 798,350 tons[4]
Source of financing:

Articles and resources

References

  1. Jump up to: 1.0 1.1 "Project Details," Thermal Power Corporation website, accessed January 2012
  2. Wikimapia, accessed November 16, 2012
  3. Monthly Report on Broad Status of Thermal Power Projects in the Country, Central Electricity Authority, September 2012
  4. For estimation method, see Estimating carbon dioxide emissions for proposed coal plants in India

Related SourceWatch articles


External resources

External articles