Difference between revisions of "Bander power station"
(fixed map ref) |
(tweaked status) |
||
Line 5: | Line 5: | ||
{{#display_point:14.33556, 80.14944|width=500|height=400|type=satellite|zoom=13}} | {{#display_point:14.33556, 80.14944|width=500|height=400|type=satellite|zoom=13}} | ||
==Background== | ==Background== | ||
− | '''Bander power station''' is a coal-fired power station in Andhra Pradesh being developed in two phases by [[Thermal Powertech Corporation]]. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW.<ref name=Details/> | + | '''Bander power station''' is a coal-fired power station in Andhra Pradesh being developed in two phases by [[Thermal Powertech Corporation]]. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW. Although the Central Electricity Authority lists the plant for 2014 completion, it is not clear that the project has actually begun construction.<ref name=Details/> |
==Project Details== | ==Project Details== | ||
'''Sponsor:''' [[Thermal Powertech Corporation]]<br> | '''Sponsor:''' [[Thermal Powertech Corporation]]<br> | ||
'''Location:''' Pyanampuram Village (about 6 km north of Krishnapatnam port), Mutukur Mandal, SPS Nellore District of Andhra Pradesh<ref>[http://www.tpcil.com/map.html Wikimapia,] accessed November 16, 2012</ref><br> | '''Location:''' Pyanampuram Village (about 6 km north of Krishnapatnam port), Mutukur Mandal, SPS Nellore District of Andhra Pradesh<ref>[http://www.tpcil.com/map.html Wikimapia,] accessed November 16, 2012</ref><br> | ||
'''Coordinates:''' 14.33556, 80.14944<br> | '''Coordinates:''' 14.33556, 80.14944<br> | ||
− | '''Status:''' | + | '''Status:''' Advanced development<br> |
'''Nameplate capacity:''' 1320 MW (Phase-I 660 MW; Phase-II 660 MW)<br> | '''Nameplate capacity:''' 1320 MW (Phase-I 660 MW; Phase-II 660 MW)<br> | ||
'''Type:''' Supercritical<br> | '''Type:''' Supercritical<br> |
Revision as of 15:00, 16 November 2012
{{#badges: CoalSwarm|Navbar-Indiacoal}}
Bander power station is a coal-fired power station currently being developed in Andhra Pradesh. It is also known as Pynampuram Thermal Power Project.
Contents
Background
Bander power station is a coal-fired power station in Andhra Pradesh being developed in two phases by Thermal Powertech Corporation. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW. Although the Central Electricity Authority lists the plant for 2014 completion, it is not clear that the project has actually begun construction.[1]
Project Details
Sponsor: Thermal Powertech Corporation
Location: Pyanampuram Village (about 6 km north of Krishnapatnam port), Mutukur Mandal, SPS Nellore District of Andhra Pradesh[2]
Coordinates: 14.33556, 80.14944
Status: Advanced development
Nameplate capacity: 1320 MW (Phase-I 660 MW; Phase-II 660 MW)
Type: Supercritical
Projected in service: Phase-I May 2014; Phase-II August 2014[3]
Coal Type:
Coal Source: Imported coal will be transported by ship to Krishnapatnam Port. Indigenous coal will be brought by rail from Ib Valley/Talcher to Paradip/ Dhamra Port and then transported by sea to Krishnapatnam Port[1]
Estimated annual CO2: 798,350 tons[4]
Source of financing:
Articles and resources
References
- ↑ Jump up to: 1.0 1.1 "Project Details," Thermal Power Corporation website, accessed January 2012
- ↑ Wikimapia, accessed November 16, 2012
- ↑ Monthly Report on Broad Status of Thermal Power Projects in the Country, Central Electricity Authority, September 2012
- ↑ For estimation method, see Estimating carbon dioxide emissions for proposed coal plants in India