Difference between revisions of "Mauda power station"
(added exact, new status) |
|||
Line 12: | Line 12: | ||
==Project Details== | ==Project Details== | ||
'''Sponsor:''' [[National Thermal Power Corporation]]<br> | '''Sponsor:''' [[National Thermal Power Corporation]]<br> | ||
− | '''Location:''' | + | '''Location:''' Mouda Tehsil, Nagpur district, Maharashtra<br> |
'''Coordinates:''' 21.1807403, 79.3965411 (exact)<br> | '''Coordinates:''' 21.1807403, 79.3965411 (exact)<br> | ||
− | '''Status:''' | + | '''Status:''' Phase I, Units 1 & 2 (500 MW) operating; Phase II, Units 1 & 2: Permitted<br> |
'''Nameplate capacity:''' Unit 1: 500 MW; Unit 2: 500 MW; Unit 3: 660 MW; Unit 4: 660 MW<br> | '''Nameplate capacity:''' Unit 1: 500 MW; Unit 2: 500 MW; Unit 3: 660 MW; Unit 4: 660 MW<br> | ||
'''Type:''' Supercritical<br> | '''Type:''' Supercritical<br> | ||
Line 22: | Line 22: | ||
'''Estimated annual CO<sub>2</sub>:''' <br> | '''Estimated annual CO<sub>2</sub>:''' <br> | ||
'''Source of financing:''' <br> | '''Source of financing:''' <br> | ||
+ | '''Permits and applications:''' | ||
+ | * Phase I, Units 1 & 2: [http://bit.ly/1iChTi9 Environmental Clearance,] India MoEF, January 25, 2008<br> | ||
+ | * Phase II, Units 1 & 2: [http://bit.ly/1iyG0yi Environmental Clearance,] India MoEF, December 30, 2010<br> | ||
==Resources== | ==Resources== |
Revision as of 22:01, 23 May 2014
{{#badges: CoalSwarm|Navbar-Indiacoal}} Mauda power station is a proposed coal plant in Maharashtra, India. (Alternative spelling: Mouda)
Contents
Location
The undated satellite photo below shows construction underway at the project site, which is located in Mauda Tehsil, Nagpur district, Maharashta.
Background
Mauda power station is a 1000 megawatt (MW) coal-fired power station of National Thermal Power Corporation in Maharashta, India. The first 500 MW unit was commissioned on April 19, 2012[1] The second 500 MW unit was commissioned in March 2013.[2][3]
In addition, two units of 660 MW each have been proposed. These are referred to by the Central Electricity Authority as Mouda Super Thermal Power Project II Units 3 and 4. They are projected to be commissioned in 2016.[4]
Project Details
Sponsor: National Thermal Power Corporation
Location: Mouda Tehsil, Nagpur district, Maharashtra
Coordinates: 21.1807403, 79.3965411 (exact)
Status: Phase I, Units 1 & 2 (500 MW) operating; Phase II, Units 1 & 2: Permitted
Nameplate capacity: Unit 1: 500 MW; Unit 2: 500 MW; Unit 3: 660 MW; Unit 4: 660 MW
Type: Supercritical
Projected in service: Units 3 and 4: 2016[4]
Coal Type:
Coal Source:
Estimated annual CO2:
Source of financing:
Permits and applications:
- Phase I, Units 1 & 2: Environmental Clearance, India MoEF, January 25, 2008
- Phase II, Units 1 & 2: Environmental Clearance, India MoEF, December 30, 2010
Resources
References
- ↑ ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF POWER UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR UTILITIES, Central Electricity Authority, April 30, 2012
- ↑ National Thermal Power Corporation, "Future Capacity Additions", National Thermal Power Corporation website, accessed June 2010.
- ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country" Government of India Ministry of Power, August 2013.
- ↑ Jump up to: 4.0 4.1 Monthly Report on Broad Status of Thermal Power Projects in the Country, Central Electricity Authority, September 2012
Related SourceWatch articles