{{stub}}{{#badges:CoalSwarm|Template:Navbar-SriLankacoal}} The Sri Lanka, which has no domestic coal production, is looking to rapidly expand coal-fired power generation.  ==Coal production== Both the [[U.S. Geological Survey lists ]] and the International Energy Agency list Sri Lanka as having no domestic coal production.<ref>Chin S. Kuo, [http://minerals.usgs.gov/minerals/pubs/country/20082012/myb3-20082012-ce.pdf The Mineral Industry of Sri Lanka], U.S. Geological Survey, October 2009November 2013.</ref><ref name=IEA>International Energy Agency, [http://www.iea.org/statistics/statisticssearch/report/?&country=SRILANKA&year=2011&product=CoalandPeat "Sri Lanka: Coal and Peat 2011"], International Energy Agency, accessed September 2, 2014.</ref>  ==Coal imports== The [[International Energy Agency ]] states that in 2007 approximately 60% 2011 - the most recent year that data is available for - Sri Lanka imported 760,000 tonnes of coal of which 395,000 tonnes was burned for electricity production was from iil.<ref name=IEA/> In October 2012 the Sri Lanka power minister Champika Ranawaka told Parliament that the first 300 MW unit of the Norochcholai Power plant would use between 650,000 to 700,000 tonnes of coal a year.<ref name=Procure>[http://www.lankabusinessonline.com/news/sri-lanka-power-plant-to-use-up-to-700,000-tonnes-of-coal-a-fired plants with the bulk year/1359655876 "Sri Lanka power plant to use up to 700,000 tonnes of coal a year"], Lanka Business Online'', October 17, 2012.</ref> Coal for the rest from hydro capacityplant is supplied through Lanka Coal (Pvt) Ltd, a government-owned company. Very minor amounts However, Lanka Coal put the supply of electricity were generated coal for the power plant out to tender and received two bids: one from wind Holcim, which operates cement plants which it already imports coal for, and solar photo-voltaic panelsanother from [[Nobel Resources]]<ref name=Procure/>, a company owned by casino businessman Ravi Wijeratne. (Wijeratne is a major partner in James Packer’s Colombo Crown casino.)<refname=OS>International Energy Agency, [http://www.ieasundaytimes.orglk/131103/statsbusiness-times/electricitydatasl-considers-investments-in-foreign-coal-mines-67677.asp?COUNTRY_CODE=LK html "SL considers investments in foreign coal mines"Electricity], ''Sunday Times'', November 03, 2013.</Heat ref> Ranawaka told parliament that at first Holcim Trading (Pvt) Ltd had been awarded the contract but that this was overturned in Sri favour of Nobel Resources following an appeal to cabinet. It was reported that Holcim had bid US$58.763 million and Nobel Resources US$58.736 million to supply 325,839 tonnes.<ref name=Procure/>  Member of Parliament Dayasiri Jayasekera told parliament that Holcim's bid included the cost of coal landed at the jetty - including the costs of barge transport from the coal carriers while Nobel's excluded the costs of barging. Power Minister Ranawaka stated that Lanka Coal had already bought a barge which would be operated by the government-owned Ceylon Shipping Corporation a state-run firm. However, he said that in 2007"], International future tenders the cost of barging operations would be included.<ref name=Procure/>  In November 2013 it was reported that the Power and Energy Agency websiteMinistry had undertaken a tender process. While the lowest bidder was from The controversy over the awarding of the coal contract provided the impetus for the government to consider direct investment in a coal mine.<ref name=OS/> ==Electricity generation== In 2011 - the year most recent IEA data is available for - 50% of Sri Lanka's power generation was based on imported oil-fired generation with hydro accounting for 40% and coal 9%. Solar photovoltaics accounted for just 0.1% and wind 0.7%. The total amount of electricity generated was 11, accessed June 2010646 gigawatt hours.<ref name=IEA/ref>
==Proposed coal-fired power stations==
*===Sampur power station===[[Sampur power station]], a 500 megawatt (MW) coal-fired power station which has been proposed to be constructed at Sampur, Trincomalee in Sri Lanka. The project would be developed through a joint venture company between the the [[National Thermal Power Corporation]] (NTPC) and the [[Ceylon Electricity Board]]."<ref>National Thermal Power Corporation, [https://www.ntpc.co.in/index.php?option=com_content&view=article&id=120&lang=en "Announcements 2006-07"], National Thermal Power Corporation website, accessed June 2010.</ref>*===Lakvijaya Power Plant===[[Norochcholai Lakvijaya Power Plant]] is an existing 600 megawatt coal-fired power station in the Puttalam District of the Northwestern Provincein Sri Lanka. It was Sri Lanka's first coal power plant. The existing plant comprise two 300 MW generatinh units with a third inder construction and scheduled for commissioning in late 2014.  The Chinese government thorough the [[Export-Import Bank of China]] provided US$455 million for the Lakvijaya plant. The delivery of the first shipment of 65, 500 MT of coal at a cost of US$7 million from [[Indonesia and coal|Indonesia]] was expected to be operation by in the first week of November 2010.<ref>Shirajiv Sirimane, [http://www.sundayobserver.lk/2010/10/24/new40.asp "Two major development projects from November "], ''Sunday Observer'', October 24, 2010. </ref>  The first phase unit was commissioned in late March 2011. Under Phase One of the plant is to inject project, 300 MW , which amounted to 17% of the main grid by 2011national power requirement of the country, while was be added to the second country's National Grid.<ref>[http://www.colombopage.com/archive_11/Mar21_1300714014JR.php "First phase is scheduled of Sri Lanka's first coal power plant to be completed by 2013 and is expected opened tomorrow"] 'ColomboPage', March 21, 2011.</ref> In August 2011, the Export-Import Bank of China offered an $891 million loan to inject build the second phase of 600 MW to the national grid. <ref name=china>[http://www.cnbc.com/id/44070538/Factbox_China_Sri_Lanka_economic_ties "Factbox: China-Sri Lanka economic ties"] Reuters, Aug. 9, 2011.</ref> ===Japan offers $600 million loan for Southern province power station=== In october 2010, a sudden fire broke out at March 2013 it was reported that the plant. According to Ceylon Electricity Board officials, (CEB) was planning a 500 MW coal-fired power station at Ahuruwella near Induruwa on the fire erupted due to the clogging of a chimney that emits waste south west coast with assistance from the combustion of coal. The fire will not interrupt constructionJapan. The news report stated that "the plant would use eco-friendly technology and funding is being built by China on a long term Chinese creditexpected from Japan. Industry sources say funding has been requested from Japan but no decision has been made." <ref>[http://www.colombopagelankabusinessonline.com/archive_10Bnews/Oct24_1287928119CH.php Sri_Lanka_plans_500MW_coal_plant_in_South_West/92596143 "Minister orders a full report on fire at Sri Lanka power plans 500MW coal plantin South West"] Colombo Page, Oct. 24''Lanka Business Online'', March 21, 20102013.</ref> The delivery In May 2013 the Chairman of the first shipment of 65CEB, W.P. Ganegala,announced that a 500 MT of MW coal -fired power station costing approximately $US500 million would be established in the Southern Province at a cost of US$7 million from location yet to be decided. However, this seems likely to be referring to the Ahuruwella proposal. The ''Sunday Times'' stated that while surveys were underway a location had not been selected. Ganegala stated that during a visit to Japan by Sri Lankan President Mahinda Rajapaksa in March 2013 the Japanese government had offered to assist with the project. Ganegala stated that it was expected that work on the plant would begin in late 2013 and take 18 months.<ref>[[Indonesia and http://www.sundaytimes.lk/130526/news/japan-to-build-coal-power-plant-in-south-46368.html "Japan to build coal|Indonesia-power plant in south"]] is expected in , ''The Sunday Times'', May 26, 2013.</ref> In June 2013 Reuters reported discussion between Sri Lanka and the first week of NovemberJapan International Cooperation Agency (JICA) for a $600 million loan to fund a 600 MW coal plant. The next step would be a visit to Sri Lanka by a Japanese team to begin a feasibility assessment.<ref>Shirajiv Sirimane, [http://www.sundayobserverreuters.lkcom/article/20102013/1006/2407/new40.asp srilanka-coal-japan-idUSL3N0EJ28520130607 "Two major development projects from NovemberSri Lanka in talks on $600 mln Japan loan for coal power plant,"] Sunday ObserverReuters, June 7, 2013</ref> ==Coal transport==Sri Lanka has signed a $450 million deal with [[China Merchants Holdings]] and Sri Lanka's [[Aitken Spence]] to boost Sri Lanka Colombo port's cargo-handling capacity.<ref name=china/> China has also lent $400 million for the first phase of the proposed [[Hambantota Port]].<ref name=china/> ==Relations with China==China was Sri Lanka's largest lender in 2009 and 2010, Octgiving $1.2 billion and $821 million respectively. 24In 2009, that figure accounted for 54 percent of total foreign loans, and 25 percent in 2010. In the first six months of 2011, trade between China and Sri Lanka was worth $1.28 billion; only $68 million of that was exports from Sri Lanka to China.<ref name=china/> [[China Development Bank Corporation]] has agreed to provide $1.5 billion by 2015 for construction of roads, bridges, power plants and water and irrigation schemes in Sri Lanka. China's Exim Bank has committed $102.5 million for Sri Lanka to buy 13 new diesel engines for its railways. The engines will come from Chinese manufacturers.<refname=china/>
==Articles and resources==
[[Category:National and international coal profiles]]
[[category:Sri Lanka]]
[[Category:Sri Lanka and coal]]
developer, Administrators
60,575

edits