==Background on Mine==
 
==Background on Mine==
Rights to the previously unmined 2.3 million ton-per-annum Tokisud North coal mine were sold to Essar Power (a subsidiary of the [[Essar Energy|Essar Group]]) in March 2015. Essar will use the coal to power its new 1,200-MW [[Mahan Super Thermal Power Project]] in Madhya Pradesh, which has been idling due to a lack of coal for 18 months.<ref>[http://www.essar.com/article.aspx?cont_id=ePjCUbHH7R8= Essar Power MP Ltd. Completes Acquisition of Tokisud North Coal Block], Essar Group press release, 24 Mar. 2015.</ref><ref>[http://www.greenclearancewatch.org/node/5150 Tokisud North Coal Mine], Green Clearance Watch, accessed May 2015.</ref> The mine will be open-pit, and Essar will contract with the [[AMR Group]] for mining services. Essar plans to begin mining within 2015.<ref>[https://www.mstcecommerce.com/auctionhome/coalblock/RenderFileCoalBlock.jsp Tokisud North Mine], MSTC website, accessed May 2015.</ref>
+
Rights to the previously unmined 2.3 million ton-per-annum Tokisud North coal block were sold to Essar Power (a subsidiary of the [[Essar Energy|Essar Group]]) in March 2015. Essar will use the coal to power its new 1,200-MW [[Mahan Super Thermal Power Project]] in Madhya Pradesh, which has been idling due to a lack of coal for 18 months.<ref>[http://www.essar.com/article.aspx?cont_id=ePjCUbHH7R8= Essar Power MP Ltd. Completes Acquisition of Tokisud North Coal Block], Essar Group press release, 24 Mar. 2015.</ref><ref name=watch>[http://www.greenclearancewatch.org/node/5150 Tokisud North Coal Mine], Green Clearance Watch, accessed May 2015.</ref> The mine will be open-pit, and Essar will contract with the [[AMR Group]] for mining services. Essar plans to begin mining within 2015.<ref>[https://www.mstcecommerce.com/auctionhome/coalblock/RenderFileCoalBlock.jsp Tokisud North Mine], MSTC website, accessed May 2015.</ref>
 +
 
 +
Rights to the Tokisud North coal block [[Tokisud coal mine|had been previously owned]] by [[GVK Coal (Tokisud) Company]], a subsidiary of [[GVK]], which won a bid for this coal block in 2005, in order to supply the [[Goindwal Sahib Thermal Power Plant]]; however, GVK apparently did not take advantage of the coal block, and the block was reauctioned in 2015.<ref name="Request">GVK, [http://www.gvk.com/files/tenders/FinalNITTokisudCoalMine_June10_2011.pdf "Request for qualification notice"], GVK Coal (Tokisud) Company Private Limited, June 2011.</ref><ref>GVK, [http://www.gvk.com/investorrelations/investors/investors.aspx "Investors"], GVK website, accessed January 2012.</ref>
 +
 
 +
The project involves the relocation of the villages of Devgarh, Urej and Ango, consisting of 1,207 people in total; it is unclear whether this relocation has already been conducted.<ref name=watch/>
  
 
==Mine Details==  
 
==Mine Details==  
Line 28: Line 32:
  
 
===Related SourceWatch articles===
 
===Related SourceWatch articles===
 +
*[[Tokisud coal mine]]
 +
*[[Mahan Super Thermal Power Project]]
 +
*[[Essar Energy]]
 +
*[[GVK Coal (Tokisud) Company]]
 
*[[India and coal]]
 
*[[India and coal]]
  

Revision as of 06:33, 16 May 2015

{{#badges:CoalSwarm|Navbar-Indiacoal}}Tokisud North coal mine is a proposed 2.3 million ton-per-annum (MTPA) coal mine in Jharkhand state, India.

Location

The map below shows the location of the mine's site, near Tokisud village, Hazaribagh district, Jharkhand state. The mine will be on a previously unmined part of the much larger South Karanpura coalfield.


Background on Mine

Rights to the previously unmined 2.3 million ton-per-annum Tokisud North coal block were sold to Essar Power (a subsidiary of the Essar Group) in March 2015. Essar will use the coal to power its new 1,200-MW Mahan Super Thermal Power Project in Madhya Pradesh, which has been idling due to a lack of coal for 18 months.[1][2] The mine will be open-pit, and Essar will contract with the AMR Group for mining services. Essar plans to begin mining within 2015.[3]

Rights to the Tokisud North coal block had been previously owned by GVK Coal (Tokisud) Company, a subsidiary of GVK, which won a bid for this coal block in 2005, in order to supply the Goindwal Sahib Thermal Power Plant; however, GVK apparently did not take advantage of the coal block, and the block was reauctioned in 2015.[4][5]

The project involves the relocation of the villages of Devgarh, Urej and Ango, consisting of 1,207 people in total; it is unclear whether this relocation has already been conducted.[2]

Mine Details

  • Sponsor: Essar Power
  • Parent company: Essar Group
  • Location: Tokisud village, Hazaribagh district, Jharkhand state, India
  • Coordinates: 23.701, 85.231 (exact)
  • Status: Proposed
  • Capacity: 2.3 MTPA
  • Reserves: 93 MT
  • In service: 2015
  • Permits:
  • Coal type:
  • Mining method: Surface
  • Source of financing:

Articles and resources

References

  1. Essar Power MP Ltd. Completes Acquisition of Tokisud North Coal Block, Essar Group press release, 24 Mar. 2015.
  2. Jump up to: 2.0 2.1 Tokisud North Coal Mine, Green Clearance Watch, accessed May 2015.
  3. Tokisud North Mine, MSTC website, accessed May 2015.
  4. GVK, "Request for qualification notice", GVK Coal (Tokisud) Company Private Limited, June 2011.
  5. GVK, "Investors", GVK website, accessed January 2012.