Huawei Hetian power station

184 bytes added, 01:09, 20 July 2016
no edit summary
{{#badges:CoalSwarm|Navbar-Chinacoal}}'''Huawei Hetian power station''' (华威和田发电有限公司二期热电联产项目) is a proposed 870270-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.
==Location==
The power station consist of two phases. Phase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.<ref>[http://www.xbjg.com/cn/news_view.asp?id=184 "兵团建工集团签定华威和田热电厂工程总承包协议,"] 本站原创, 2012-2-1</ref><ref>[http://bit.ly/1mucCOA "兵团建工集团签定华威和田热电厂工程总承包协议"], 新疆兵团建设工程集团, 2012-2-1</ref> As of 2014 the two units are under construction.<ref>[http://www.xjslt.gov.cn/stbcc/jdgl/2014/28792.htm "华威和田热电厂2*135WM工程水土保持督查意见,"] 打印, 2014-08-06</ref>
Unit 1 began operating in April 2015.,<ref>[http://www.xjht.gov.cn/Article/ShowArticle.aspx?ArticleID=219840 "华威和田热电厂一号机组投产闫国灿艾则孜•木沙出席投产仪式,"] 和田日报 发表时间, 2015-4-20</ref> and unit 2 in November 2015.<ref>[http://yuanjian.bjeit.gov.cn/xwdt/89347.htm "华威和田2×135MW热电厂发电机组成功并网,"] 规划布局处, 2015-11-25</ref>
==Expansion==Phase II is would be a coal-fired power plant with two units of 300 MW each. It is seeking permitting.<ref>[http://bit.ly/1pnFKlb "华威和田发电有限公司二期2×30万千瓦热电联产项目"], 和田地区招商局, 2014-2-26</ref>
==Project Details==
*'''Location:''' Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China
*'''Coordinates:''' 37.167593, 79.905582 (exact)
*'''Status:''' Operating (Unit Units 1), Construction (Unit -2), Announced (Units 3 and -4)*'''Gross capacity:''' 870 MW (Units 1 and -2: 135 MW; Units 3 and -4: 300 MW)
*'''Type:'''
*'''Projected in service:''' 2015 (Unit Units 1-2)
*'''Coal type:'''
*'''Coal source:'''