− | In 1999, Mining Weekly said that Leandra North and South project "will see the mining of the No 4 seam, which overlies the present Delmas Colliery No 2 seam workings, and which will extend further to the west. The development of the No 4 seam reserves in Leandra North could provide up to 30 years of mining, depending on production rates, while the adjacent Leandra South reserves – which contain both the No 2 and No 4 seams, with even greater volumes, could add additional life."<ref name=MWNS/> | + | In 1999, Mining Weekly said that the Leandra North and [[Leandra South coal project]] "will see the mining of the No 4 seam, which overlies the present Delmas Colliery No 2 seam workings, and which will extend further to the west. The development of the No 4 seam reserves in Leandra North could provide up to 30 years of mining, depending on production rates, while the adjacent Leandra South reserves – which contain both the No 2 and No 4 seams, with even greater volumes, could add additional life."<ref name=MWNS/> |
[[BHP Billiton]] listed it as a possible underground mine producing thermal coal in its 2009 Annual Report. It listed its "measured resource" as being 156 million tonnes with a total resource of 715 million tonnes.<ref name="AR092">BHP Billiton, [http://www.bhpbilliton.com/bbContentRepository/docs/annualReport2009.pdf 2009 BHP Billiton Annual Report], BHP Billiton, September 2009, page 90.</ref> [[BHP Billiton Energy Coal South Africa]] is BHP Billiton's wholly owned subsidiary which develops coal projects in South Africa. | [[BHP Billiton]] listed it as a possible underground mine producing thermal coal in its 2009 Annual Report. It listed its "measured resource" as being 156 million tonnes with a total resource of 715 million tonnes.<ref name="AR092">BHP Billiton, [http://www.bhpbilliton.com/bbContentRepository/docs/annualReport2009.pdf 2009 BHP Billiton Annual Report], BHP Billiton, September 2009, page 90.</ref> [[BHP Billiton Energy Coal South Africa]] is BHP Billiton's wholly owned subsidiary which develops coal projects in South Africa. |
Revision as of 18:38, 30 October 2019
{{#badges: CoalSwarm|Navbar-SouthAfricaCoal}} The Leandra North coal project is a possible South African coal project. It is located about 20 km northwest of Leandra in the Delmas coal mine[1][2] in the Mpumalanga province.
Contents
Location
The map below shows the approximate location of the project.
Background
In 1999, Mining Weekly said that the Leandra North and Leandra South coal project "will see the mining of the No 4 seam, which overlies the present Delmas Colliery No 2 seam workings, and which will extend further to the west. The development of the No 4 seam reserves in Leandra North could provide up to 30 years of mining, depending on production rates, while the adjacent Leandra South reserves – which contain both the No 2 and No 4 seams, with even greater volumes, could add additional life."[1]
BHP Billiton listed it as a possible underground mine producing thermal coal in its 2009 Annual Report. It listed its "measured resource" as being 156 million tonnes with a total resource of 715 million tonnes.[3] BHP Billiton Energy Coal South Africa is BHP Billiton's wholly owned subsidiary which develops coal projects in South Africa.
In its 2014 annual report, BHP Billiton reports this project's "measured resources" as 210 million tonnes and its "total resources" as 507 million tonnes.[4]
BHP Billiton announced in its 2015 annual report that they were discontinuing this project, demerging it and, with a handful of other coal projects, rolling it into a new company called South32.[5]
Project Details
- Owner: South Africa Energy Coal
- Parent company: South32
- Location:
- GPS coordinates: -26.259222, 28.828306 (approximate)
- Mine status: Proposed
- Start year:
- Mineable reserves:
- Coal type: Thermal
- Mine size:
- Mine type: Underground
- Production:
- Additional proposed production:
- Equipment:
- Number of employees:
Articles and resources
References
- ↑ Jump up to: 1.0 1.1 Coal king courts Leandra, Mining Weekly, 5 Nov. 1999
- ↑ Delmas Colliery, South Africa, Mining Weekly, 28 Jan. 2000
- ↑ BHP Billiton, 2009 BHP Billiton Annual Report, BHP Billiton, September 2009, page 90.
- ↑ BHP Billiton Annual Report 2014, pp. 122-123, BHP Billiton website, accessed Oct. 2019.
- ↑ BHP Billiton Annual Report 2015, BHP Billiton website, accessed Oct. 2019.