{{#Show badges: |CoalSwarm|Navbar-Chinacoal}}'''Huawei Hetian power station''' (华威和田发电有限公司二期热电联产项目) is a 270-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.
==Location==The map undated satellite photo below shows the location of power station in Hotan (Hetian but not the exact location of the project) Prefecture.{{#display_point:Hetian37.167593, Xinjiang, China79.905582|width=500600|height=400500|type=normalhybrid|zoom=316}}==Description=='''Huawei Hetian City Power Plant Phase II''' is a 600 megawatt (MW) coal plant under development in Xinjiang Province, China. The project is sponsored by Beijing Huawei Hetian Investment Ltd. and Zhongmu Co.<ref name=WRI>Ailun Yang and Yiyun Cui, [http://pdf.wri.org/global_coal_risk_assessment.pdf "Global Coal Risk Assessment: Data Analysis and Market Research,"] World Resources Institute working paper, November 2012</ref>
==Background on Project Details=='''Sponsor:''' Beijing Huawei Hetian Investment LtdThe power station consist of two phases. and Zhongmu CoPhase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.<brref>'''Location[http:''' Hetian, Xinjiang, China (location of Hetian but not the exact location of the project//www.xbjg.)<br>'''Coordinates:''' 37com/cn/news_view.114157asp?id=184 "兵团建工集团签定华威和田热电厂工程总承包协议,"] 本站原创,79.922211 2012-2-1<br/ref>'''Status:''' Planning<ref name=WRI/><br>'''Nameplate capacity[http:''' 600 MW<br>'''Type:''' <br>'''Projected in service:''' <br> '''Coal Type:''' <br>'''Coal Source:''' <br>'''Estimated annual CO<sub>//bit.ly/1mucCOA "兵团建工集团签定华威和田热电厂工程总承包协议"], 新疆兵团建设工程集团, 2012-2-1</subref>:''' As of 2014 the two units are under construction.<brref>'''Source of financing[http:''' //www.xjslt.gov.cn/stbcc/jdgl/2014/28792.htm "华威和田热电厂2*135WM工程水土保持督查意见,"] 打印, 2014-08-06<br/ref>
Unit 1 began operating in April 2015,<ref>[http://www.xjht.gov.cn/Article/ShowArticle.aspx?ArticleID=219840 "华威和田热电厂一号机组投产闫国灿艾则孜•木沙出席投产仪式,"] 和田日报 发表时间, 2015-4-20</ref> and unit 2 in November 2015.<ref>[http://yuanjian.bjeit.gov.cn/xwdt/89347.htm "华威和田2×135MW热电厂发电机组成功并网,"] 规划布局处, 2015-11-25</ref> ==Expansion==Phase II would be a coal-fired power plant with two units of 300 MW each. It is seeking permitting.<ref>[http://bit.ly/1pnFKlb "华威和田发电有限公司二期2×30万千瓦热电联产项目"], 和田地区招商局, 2014-2-26</ref> With no developments since 2014, the project appears to be shelved. ==Project Details== *'''Sponsor:''' [[Beijing Huawei Hetian Investment]] and [[Zhongmu Company]]*'''Parent company:''' *'''Location:''' Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China*'''Coordinates:''' 37.167593, 79.905582 (exact)*'''Status:''' Operating (Units 1-2), Cancelled (Units 3-4)*'''Gross capacity:''' 870 MW (Units 1-2: 135 MW; Units 3-4: 300 MW)*'''Type:''' *'''Projected in service:''' 2015 (Units 1-2)*'''Coal type:''' *'''Coal source:''' *'''Source of financing:''' ==Articles and resources==
===References===
{{reflist|2}}<references/>
===Related SourceWatch articles===
*[[China and coal]]
*[[Proposed coal plants in China]]
===External resources===
===External articles===[[Category: Proposed coal plants in Xinjiang]][[Category: Proposed coal plants in China]][[Category:Proposed coal plants in Asia]][[Category: Existing coal plants in Xinjiang]][[Category:Proposed Existing coal plants in China]][[Category:Proposed Existing coal plants in Asia]][[Category:Energy]]