Difference between revisions of "Paloncha power station"
(SW: zoom) |
|||
(22 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | {{#Badges:CoalSwarm|navbar-Indiacoal}}'''Paloncha power station''' is | + | {{#Badges:CoalSwarm|navbar-Indiacoal}} '''Paloncha power station''' is a 244-megawatt (MW) coal plant in Telangana, formerly [[Andhra Pradesh and coal|Andhra Pradesh]], India. |
==Location== | ==Location== | ||
− | The | + | The undated satellite photo below shows the Paloncha power station. Units 1 and 2 are located to the north, and Unit 3 is about one km to the south. |
− | {{# | + | {{#display_points:17.5824568, 80.6727084;17.5735436, 80.6648505|width=600|height=600|type=hybrid|zoom=15}} |
+ | |||
+ | ==Background== | ||
+ | Paloncha power station Unit 1 was built in 1996 with a capacity of 50 MW. The plant supplies a ferro-alloys plant, with surplus power sold to the grid.<ref>[http://www.industcards.com/st-coal-india-ap.htm "Coal-Fired Plants in Andhra Pradesh and Telangana,"] Power Plants Around the World, accessed January 2016</ref> In 2000, a fire at the plant reduced capacity to 30 MW. In 2006, the company added unit 2, with 64 MW.<Ref>[http://economictimes.indiatimes.com/nava-bharat-ventures-ltd/infocompanyhistory/companyid-12669.cms "Nava Bharat Ventures Company History,"] Economic Times, accessed January 2016</ref> | ||
+ | |||
+ | ==Details of expansion== | ||
+ | In April 2011, the company announced that it intended to build an additional 150 MW unit at the same location by December 2012, and a second 150 MW expansion unit if coal linkages could be secured.<ref name=INFRA>[http://bit.ly/zcPiD6 "Nava Bharat Dharmavaram power project fails to take off,"] Infra News, April 26, 2011</ref> | ||
+ | |||
+ | The first 150 MW addition (Unit 3) was commissioned and synchronized with the state power grid on Feb 28, 2013.<ref>[http://www.nbv.in/Nava-Bharat-Energy "Nava Bharat Energy India Limited (NBEIL),"] Nava Bharat Energy website, accessed March 2014.</ref> Unit 3 is located approximately 1 km south of the older plant. | ||
+ | |||
+ | As of 2016 the proposed unit 4 is not mentioned on Nava Bharat Ventures' website and no permits have been received. | ||
==Project Details== | ==Project Details== | ||
'''Sponsor:''' [[Nava Bharat Ventures Ltd]]<br> | '''Sponsor:''' [[Nava Bharat Ventures Ltd]]<br> | ||
− | '''Location:''' Paloncha, Khamman district, Andhra Pradesh<br> | + | '''Location:''' Paloncha village, Khamman district, Telangana (formerly Andhra Pradesh)<br> |
− | '''Coordinates:''' 17. | + | '''Coordinates:''' Unit 1: 17.5824568, 80.6727084 (exact), Unit 2: 17.5735436, 80.6648505 (exact)<br> |
− | ''' | + | '''Nameplate capacity:''' |
− | ''' | + | *Unit 1: 30 MW (originally 50 MW prior to fire damage in 2000) |
− | '''Type:''' <br> | + | *Unit 2: 64 MW |
− | '''Projected in service:''' | + | *Unit 3: 150 MW |
+ | *Unit 4: 150 MW | ||
+ | '''Status:''' | ||
+ | *Unit 1: Operating (1996) | ||
+ | *Unit 2: Operating (2006) | ||
+ | *Unit 3: Operating (2013) | ||
+ | *Unit 4: Cancelled | ||
+ | '''Type:''' [[Subcritical]]<br> | ||
+ | '''Projected in service:''' | ||
+ | *Unit 2: 2013 | ||
'''Coal Source:''' <br> | '''Coal Source:''' <br> | ||
'''Estimated annual CO<sub>2</sub>:''' <br> | '''Estimated annual CO<sub>2</sub>:''' <br> | ||
− | '''Source of financing:''' <br> | + | '''Source of financing:''' <br> |
==Resources and articles== | ==Resources and articles== | ||
Line 21: | Line 40: | ||
*[[India and coal]] | *[[India and coal]] | ||
*[[Proposed coal plants in India]] | *[[Proposed coal plants in India]] | ||
+ | |||
+ | |||
+ | ===References=== | ||
+ | {{reflist|2}} | ||
+ | |||
+ | ===External Articles=== | ||
{{#display_points: | {{#display_points: | ||
− | + | center=22,82.43 | |
|width=400 | |width=400 | ||
|height=350 | |height=350 | ||
Line 40: | Line 65: | ||
13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.; | 13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.; | ||
26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.; | 26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.; | ||
− | 22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information. | + | 22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information. |
|zoom=4 | |zoom=4 | ||
}} | }} | ||
− | + | [[category:india]] [[category:mining]][[Category: Proposed coal plants in Telangana]][[Category: India and coal]][[Category: Proposed coal plants in India]][[Category: Existing coal plants in Telangana]][[Category: Existing coal plants in India]] | |
− | |||
− | |||
− | |||
− | [[category:india]] [[category:mining]][[Category: Proposed coal plants in |
Latest revision as of 01:26, 7 October 2016
{{#Badges:CoalSwarm|navbar-Indiacoal}} Paloncha power station is a 244-megawatt (MW) coal plant in Telangana, formerly Andhra Pradesh, India.
Contents
Location
The undated satellite photo below shows the Paloncha power station. Units 1 and 2 are located to the north, and Unit 3 is about one km to the south.
Background
Paloncha power station Unit 1 was built in 1996 with a capacity of 50 MW. The plant supplies a ferro-alloys plant, with surplus power sold to the grid.[1] In 2000, a fire at the plant reduced capacity to 30 MW. In 2006, the company added unit 2, with 64 MW.[2]
Details of expansion
In April 2011, the company announced that it intended to build an additional 150 MW unit at the same location by December 2012, and a second 150 MW expansion unit if coal linkages could be secured.[3]
The first 150 MW addition (Unit 3) was commissioned and synchronized with the state power grid on Feb 28, 2013.[4] Unit 3 is located approximately 1 km south of the older plant.
As of 2016 the proposed unit 4 is not mentioned on Nava Bharat Ventures' website and no permits have been received.
Project Details
Sponsor: Nava Bharat Ventures Ltd
Location: Paloncha village, Khamman district, Telangana (formerly Andhra Pradesh)
Coordinates: Unit 1: 17.5824568, 80.6727084 (exact), Unit 2: 17.5735436, 80.6648505 (exact)
Nameplate capacity:
- Unit 1: 30 MW (originally 50 MW prior to fire damage in 2000)
- Unit 2: 64 MW
- Unit 3: 150 MW
- Unit 4: 150 MW
Status:
- Unit 1: Operating (1996)
- Unit 2: Operating (2006)
- Unit 3: Operating (2013)
- Unit 4: Cancelled
Type: Subcritical
Projected in service:
- Unit 2: 2013
Coal Source:
Estimated annual CO2:
Source of financing:
Resources and articles
Related SourceWatch articles
References
- ↑ "Coal-Fired Plants in Andhra Pradesh and Telangana," Power Plants Around the World, accessed January 2016
- ↑ "Nava Bharat Ventures Company History," Economic Times, accessed January 2016
- ↑ "Nava Bharat Dharmavaram power project fails to take off," Infra News, April 26, 2011
- ↑ "Nava Bharat Energy India Limited (NBEIL)," Nava Bharat Energy website, accessed March 2014.