Difference between revisions of "Sri Damodaram Sanjeevaiah Thermal Power Station"

From SourceWatch
Jump to navigation Jump to search
 
(65 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 
{{#badges: CoalSwarm|Navbar-Indiacoal}}   
 
{{#badges: CoalSwarm|Navbar-Indiacoal}}   
 +
'''Damodaram Sanjeevaiah Thermal Power Station,''' also known as the '''Krishnapatnam Supercritical thermal power project,''' is a power station in [[Andhra Pradesh and coal|Andhra Pradesh]], India.
  
Sri Damodaram Sanjeevaiah (Krishnapatnam) Thermal Power Station is a 1600 megawatt (MW) coal plant under construction by [[Andhra Pradesh Power Generation Corporation]] (APGENCO) in Andhra Pradesh.
+
==Location==
 +
The photo below shows the plant in Nelaturu village, near Krishnapatnam and 23 km from Nellore city of Andhra Pradesh.
 +
{{#display_point:14.3276045,80.122105|width=600|height=500|type=hybrid|zoom=16}}
 +
 
 +
==Background==
 +
Damodaram Sanjeevaiah Thermal Power Station is a 2400 MW coal plant under various stages of construction in the state of Andhra Pradhesh, India. It was envisioned for 1600 MW (2X 800 MW), but a terms of reference for an additional 800 MW was granted in 2012.<ref>[http://bit.ly/1eLxGtl Terms of Reference,] MoEF, Sep 26, 2012.</ref>
 +
 
 +
The project will use [[Supercritical]] boilers. It is sponsored by [[Andhra Pradesh Power Generation Corporation (APGENCO)]] and is categorized as a Mega Power Project, enabling to proceed on a fast-track basis. It is designed for a mixture of 70% domestic coal and 30% imported coal. Sea water will be used for cooling. [[Krishnapatnam Port]] (5 km) will be used for importing coal.<ref name=APGEN>[http://bit.ly/zCsiDm "Projects,"] APGENCO, accessed February 2012</ref>
 +
 
 +
The Power station is designed for blended coal in the ratio of 70% washed domestic coal from [[Talcher Coalfield]] to 30% imported coal. Sea water is proposed for cooling purpose and potable water by desalination. Krishnapatnam port (about 5&nbsp;km from site) will cater to the requirement of importing heavy machinery and both domestic & imported coal of 3.5 and 1.5 million tons per annum respectively. EPC contract for the main plant has been awarded to Tata Projects Limited during July,2008 and for BOP during February 2009. The estimated complete cost of project is about Rs 8432/- Crores. The Debt & Equity ratio is 80:20 and Project is being financed by PFC and KfW, Germany.<ref>{{cite news |title=Nelatur power plant 1st unit to be ready by 2013 |url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/article2877294.ece |work=[[The Hindu]] |date=10 February 2012 |accessdate=4 September 2012 }}</ref>
  
==Location==
+
Unit 1 went into operation in March 2014,<ref>[http://www.thehindubusinessline.com/news/states/800mw-uniti-of-ap-gencos-krishnapatnam-plant-goes-on-stream/article5859426.ece "800-MW unit-I of AP Genco’s Krishnapatnam plant goes on stream,"] The Hindu, April 1, 2014.</ref> and the second unit in March 2015.<ref name=broad>[http://www.cea.nic.in/reports/proj_mon/broad_status.pdf "Monthly Report on Broad Status of Thermal Power Projects in the Country"] Government of India Ministry of Power, February 2015.</ref><ref>[http://www.business-standard.com/content/b2b-manufacturing-industry/bhel-commissions-800-mw-supercritical-boiler-at-krishnapatnam-115040200511_1.html "BHEL commissions 800 MW supercritical boiler at Krishnapatnam,"] BS, Apr 2, 2015</ref><ref>[http://www.thehindu.com/news/national/andhra-pradesh/2nd-unit-of-genco-power-plantto-be-synchronised-soon/article6615562.ece "2nd unit of Genco power plant to be synchronised soon,"] The Hindu, Nov 19, 2014</ref>
The map below shows the location of Krishnapatnam but not the exact location of the project.
+
 
{{#display_point:|Krishnapatnam, Andhra Pradesh, India|width=500|height=400|type=normal|zoom=7}}
+
===Unit 3===
 +
An environmental impact assessment was submitted for Unit 3 (Stage II) in September 2014.<ref>[http://environmentclearance.nic.in/writereaddata/EIA/25092014I4WS5R8XEIAreport.pdf "EIA,"] APGENCO, September 2014</ref> Environmental clearance was granted in July 2015. The unit would use 100% imported coal.<ref>[http://environmentclearance.nic.in/writereaddata/Form-1A/EC/070220151letter25-2012.PDF "Environmental Clearance,"] India MoEF, July 2, 2015</ref>
 +
 
 +
A foundation stone was laid in February 2016.<ref>[http://www.thehansindia.com/posts/index/Andhra-Pradesh/2016-02-27/First-supercritical-thermal-plant-in-AP-to-go-on-stream-today/210061 "First supercritical thermal plant in AP to go on stream today,"] Hans India, Feb 27, 2016</ref><ref>[http://cea.nic.in/reports/monthly/broadstatus/2016/broad_status-10.pdf "Monthly Report on Broad Status of Thermal Power Projects in the Country,"] Government of India Ministry of Power, October 2016</ref>
 +
 
 +
Boiler erection began in June 2017, and as of August 2018 is reported to be 39% complete.<ref>[http://www.cea.nic.in/reports/monthly/broadstatus/2018/broad_status-08.pdf "Monthly Report on Broad Status of Thermal Power Projects in the Country,"] Government of India Ministry of Power, August 2018</ref>
 +
 
 +
==Expansion to 4000 MW Cancelled==
 +
 
 +
The government halted plans for APGenco to expand its Damodaram Sanjeevaiah Thermal Power Station at Krishnapatnam in Nellore district, Andhra Pradesh. The plant size was expected to increase in size from 1,600 MW to 4,000 MW, cleared by government officials July 17, 2008. The government instead reallocated the land to Andhra Pradesh Industrial Infrastructure Corporation (APIIC) for onward transfer to Thermal Powertech Corporation. "It looks as though the state government came under sudden political pressure on behalf of Powertech because of which the expansion plans of a great performer like Genco was thrown to the winds and the land given to the private company," former Union power secretary E A S Sarma told the ''Times of India.'' Thermal Powertech had initially been allotted land in Machilipatnam in a prohibited coastal regulatory zone (CRZ) for its thermal plant. However, environmentalists were alarmed that the proposed site was a breeding ground for rare birds. In response, the government denied environmental clearance for the site. The land was reallocated to APIIC just weeks after the environmental clearance for the Thermal Powertech Corporation's Machilipatnam plant.<ref>Jinka Nagaraju, [http://articles.timesofindia.indiatimes.com/2009-02-19/hyderabad/28013554_1_krishnapatnam-project-power-plant-thermal-plant "YSR nips expansion plans of Krishnapatnam power plant,"] The Times of India, February 19, 2009.</ref>
 +
 
 +
==Citizen opposition==
 +
According to reports, "Villagers of Nelaturu and Painapuram and surrounding habitations (where the plant is to be built) staged a protest in December 2011." The locals demanded "payment of suitable compensation to the land acquired for construction of the power plant, besides job security for workers, a hospital and an ITI and other resources in the village."<ref>[http://ejatlas.org/conflict/damodaram-sanjeevaiah-thermal-power-station-andhra-pradesh-india "Damodaram Sanjeevaiah Thermal Power Station, Andhra Pradesh, India"] Environmental Justice Atlas, accessed April 21, 2014.</ref>
  
 
==Project Details==
 
==Project Details==
'''Sponsor:''' [[Andhra Pradesh Power Generation Corporation]] (APGENCO) <br>
+
'''Sponsor:''' [[Andhra Pradesh Power Generation Corporation (APGENCO)]]<br>
'''Location:''' Krishnapatnam, Andhra Pradesh state, India<br>
+
'''Location:''' Nelaturu village, Nellore district, Andhra Pradesh<br>
'''Coordinates:''' 14.288601, 80.124848 (approximate)<br>
+
'''Coordinates:''' 14.3276045, 80.122105 (exact)<br>
'''Status:''' Under construction<br>
+
'''Status:'''  
'''Nameplate capacity:''' 1600 MW<br>
+
*Unit 1: Operating
'''Type:''' <br>
+
*Unit 2: Operating
'''Projected in service:''' <br>
+
*Unit 3: Construction
 +
'''Nameplate capacity:'''
 +
*Unit 1: 800 MW
 +
*Unit 2: 800 MW
 +
*Unit 3: 800 MW
 +
'''Type:''' [[Supercritical]]<br>
 +
'''Projected in service:'''  
 +
*Unit 1: 2014
 +
*Unit 2: 2015
 +
*Unit 3: 2019
 
'''Coal Type:''' <br>
 
'''Coal Type:''' <br>
'''Coal Source:''' <br>
+
'''Coal Source:''' 70% washed domestic coal from [[Talcher Coalfield]] to 30% imported coal (Units 1-2); 100% imported coal (Unit 3)<br>
'''Estimated annual CO<sub>2</sub>:''' <br>
+
'''Source of financing:''' 80% debt / 20% equity - financed by PFC and KfW, Germany<ref name=APGEN/><br>
'''Source of financing:''' <br>
+
'''Permits:''' [http://bit.ly/1eLxGtl Terms of Reference, Unit 3,] India MoEF, Sep 26, 2012; [http://environmentclearance.nic.in/writereaddata/EIA/25092014I4WS5R8XEIAreport.pdf EIA, Unit 3,] Sep 2014; [http://environmentclearance.nic.in/writereaddata/Form-1A/EC/070220151letter25-2012.PDF Environmental Clearance, Unit 3,] India MoEF, July 2, 2015
  
 
==Articles and resources==
 
==Articles and resources==
 
===References===
 
===References===
{{reflist|2}}
+
{{reflist}}
  
 
===Related SourceWatch articles===
 
===Related SourceWatch articles===
Line 28: Line 59:
 
*[[Proposed coal plants in India]]
 
*[[Proposed coal plants in India]]
  
 +
 +
 +
===External resources===
 +
 +
 +
===External articles===
 
{{#display_points:
 
{{#display_points:
|center=22,82.43
+
center=22,82.43
 
|width=400
 
|width=400
 
|height=350
 
|height=350
Line 47: Line 84:
 
13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.;
 
13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.;
 
26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.;
 
26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.;
22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information.;
+
22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information.
 
|zoom=4
 
|zoom=4
 
}}
 
}}
  
===External resources===
+
{{Wikipedia}}
 
 
 
 
===External articles===
 
 
 
  
 
[[Category:Proposed coal plants in Andhra Pradesh]]
 
[[Category:Proposed coal plants in Andhra Pradesh]]
Line 61: Line 94:
 
[[Category:Proposed coal plants in Asia]]
 
[[Category:Proposed coal plants in Asia]]
 
[[Category:India]]
 
[[Category:India]]
 +
[[Category:Existing coal plants in Andhra Pradesh]]
 +
[[Category:Existing coal plants in India]]
 +
[[Category:Existing coal plants in Asia]]

Latest revision as of 04:08, 14 December 2018

{{#badges: CoalSwarm|Navbar-Indiacoal}} Damodaram Sanjeevaiah Thermal Power Station, also known as the Krishnapatnam Supercritical thermal power project, is a power station in Andhra Pradesh, India.

Location

The photo below shows the plant in Nelaturu village, near Krishnapatnam and 23 km from Nellore city of Andhra Pradesh.

Background

Damodaram Sanjeevaiah Thermal Power Station is a 2400 MW coal plant under various stages of construction in the state of Andhra Pradhesh, India. It was envisioned for 1600 MW (2X 800 MW), but a terms of reference for an additional 800 MW was granted in 2012.[1]

The project will use Supercritical boilers. It is sponsored by Andhra Pradesh Power Generation Corporation (APGENCO) and is categorized as a Mega Power Project, enabling to proceed on a fast-track basis. It is designed for a mixture of 70% domestic coal and 30% imported coal. Sea water will be used for cooling. Krishnapatnam Port (5 km) will be used for importing coal.[2]

The Power station is designed for blended coal in the ratio of 70% washed domestic coal from Talcher Coalfield to 30% imported coal. Sea water is proposed for cooling purpose and potable water by desalination. Krishnapatnam port (about 5 km from site) will cater to the requirement of importing heavy machinery and both domestic & imported coal of 3.5 and 1.5 million tons per annum respectively. EPC contract for the main plant has been awarded to Tata Projects Limited during July,2008 and for BOP during February 2009. The estimated complete cost of project is about Rs 8432/- Crores. The Debt & Equity ratio is 80:20 and Project is being financed by PFC and KfW, Germany.[3]

Unit 1 went into operation in March 2014,[4] and the second unit in March 2015.[5][6][7]

Unit 3

An environmental impact assessment was submitted for Unit 3 (Stage II) in September 2014.[8] Environmental clearance was granted in July 2015. The unit would use 100% imported coal.[9]

A foundation stone was laid in February 2016.[10][11]

Boiler erection began in June 2017, and as of August 2018 is reported to be 39% complete.[12]

Expansion to 4000 MW Cancelled

The government halted plans for APGenco to expand its Damodaram Sanjeevaiah Thermal Power Station at Krishnapatnam in Nellore district, Andhra Pradesh. The plant size was expected to increase in size from 1,600 MW to 4,000 MW, cleared by government officials July 17, 2008. The government instead reallocated the land to Andhra Pradesh Industrial Infrastructure Corporation (APIIC) for onward transfer to Thermal Powertech Corporation. "It looks as though the state government came under sudden political pressure on behalf of Powertech because of which the expansion plans of a great performer like Genco was thrown to the winds and the land given to the private company," former Union power secretary E A S Sarma told the Times of India. Thermal Powertech had initially been allotted land in Machilipatnam in a prohibited coastal regulatory zone (CRZ) for its thermal plant. However, environmentalists were alarmed that the proposed site was a breeding ground for rare birds. In response, the government denied environmental clearance for the site. The land was reallocated to APIIC just weeks after the environmental clearance for the Thermal Powertech Corporation's Machilipatnam plant.[13]

Citizen opposition

According to reports, "Villagers of Nelaturu and Painapuram and surrounding habitations (where the plant is to be built) staged a protest in December 2011." The locals demanded "payment of suitable compensation to the land acquired for construction of the power plant, besides job security for workers, a hospital and an ITI and other resources in the village."[14]

Project Details

Sponsor: Andhra Pradesh Power Generation Corporation (APGENCO)
Location: Nelaturu village, Nellore district, Andhra Pradesh
Coordinates: 14.3276045, 80.122105 (exact)
Status:

  • Unit 1: Operating
  • Unit 2: Operating
  • Unit 3: Construction

Nameplate capacity:

  • Unit 1: 800 MW
  • Unit 2: 800 MW
  • Unit 3: 800 MW

Type: Supercritical
Projected in service:

  • Unit 1: 2014
  • Unit 2: 2015
  • Unit 3: 2019

Coal Type:
Coal Source: 70% washed domestic coal from Talcher Coalfield to 30% imported coal (Units 1-2); 100% imported coal (Unit 3)
Source of financing: 80% debt / 20% equity - financed by PFC and KfW, Germany[2]
Permits: Terms of Reference, Unit 3, India MoEF, Sep 26, 2012; EIA, Unit 3, Sep 2014; Environmental Clearance, Unit 3, India MoEF, July 2, 2015

Articles and resources

References

  1. Terms of Reference, MoEF, Sep 26, 2012.
  2. Jump up to: 2.0 2.1 "Projects," APGENCO, accessed February 2012
  3. "Nelatur power plant 1st unit to be ready by 2013", The Hindu (10 February 2012). Retrieved on 4 September 2012. 
  4. "800-MW unit-I of AP Genco’s Krishnapatnam plant goes on stream," The Hindu, April 1, 2014.
  5. "Monthly Report on Broad Status of Thermal Power Projects in the Country" Government of India Ministry of Power, February 2015.
  6. "BHEL commissions 800 MW supercritical boiler at Krishnapatnam," BS, Apr 2, 2015
  7. "2nd unit of Genco power plant to be synchronised soon," The Hindu, Nov 19, 2014
  8. "EIA," APGENCO, September 2014
  9. "Environmental Clearance," India MoEF, July 2, 2015
  10. "First supercritical thermal plant in AP to go on stream today," Hans India, Feb 27, 2016
  11. "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, October 2016
  12. "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, August 2018
  13. Jinka Nagaraju, "YSR nips expansion plans of Krishnapatnam power plant," The Times of India, February 19, 2009.
  14. "Damodaram Sanjeevaiah Thermal Power Station, Andhra Pradesh, India" Environmental Justice Atlas, accessed April 21, 2014.

Related SourceWatch articles


External resources

External articles

Wikipedia also has an article on Sri Damodaram Sanjeevaiah Thermal Power Station. This article may use content from the Wikipedia article under the terms of the GFDL.