Difference between revisions of "Gudur Thermal Power Project (Momidi)"
(3 intermediate revisions by 2 users not shown) | |||
Line 6: | Line 6: | ||
==Background== | ==Background== | ||
− | Gudur Thermal Power Project (Momidi) is a proposed 2640 megawatt (MW) coal plant in Momidi, Chillakkur mandal, Nellore district. The project is planned in two phases, each 1320 MW.<ref name=thermal>[http://bit.ly/yxjnkY "2640 MW Gudur TPP near Momidi Village, by Pragdisa Power Pvt. Ltd.,"] Thermal MoEF News, July 13, 2011</ref> The project was issued a Term of Reference (ToR) on September 9, 2010.<ref name=thermal/> | + | Gudur Thermal Power Project (Momidi) is a proposed 2640 megawatt (MW) coal plant in Momidi, Chillakkur mandal, Nellore district. The project is planned in two phases, each 1320 MW.<ref name=thermal>[http://bit.ly/yxjnkY "2640 MW Gudur TPP near Momidi Village, by Pragdisa Power Pvt. Ltd.,"] Thermal MoEF News, July 13, 2011</ref> The project was issued a Term of Reference (ToR) on September 9, 2010.<ref name=thermal/> In 2011 the company applied for consideration under the Clean Development Mechanism. The company argued that the plant would be significantly more efficient than the norm for India:<ref name=CDM>[http://bit.ly/1ouNP76 "CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD), Gudur Thermal Power Project,"] March 18, 2011</ref> |
− | + | :The Central Electricity Authority (CEA) has estimated the efficiency of subcritical power plants to be 32.63% based on the normative Gross Heat Rate of 2450 kcal/kWh in India. The estimated station heat rate in the project activity will be around 2176 kcal/kWh2. Based on this data, it is evident that the efficiency of power plants using supercritical technology would be more efficient in comparison to the power plants using subcritical technology. | |
+ | Since 2011, there have been no reports of further development of the project and no applications for further environmental clearances. The project appears to be shelved or cancelled. | ||
==Project Details== | ==Project Details== | ||
'''Sponsor:''' [[Pragdisa Power Private Ltd]]<br> | '''Sponsor:''' [[Pragdisa Power Private Ltd]]<br> | ||
+ | '''Parent company:''' [[Lanco Group]]<br> | ||
'''Location:''' Momidi village, Chillakur mandal, Nellore district, Andhra Pradesh<br> | '''Location:''' Momidi village, Chillakur mandal, Nellore district, Andhra Pradesh<br> | ||
'''Coordinates:''' 14.130902, 79.864683 (approximate)<br> | '''Coordinates:''' 14.130902, 79.864683 (approximate)<br> | ||
− | '''Status:''' | + | '''Status:''' Cancelled<br> |
'''Nameplate capacity:''' Phase I: 1320 MW; Phase II: 1320 MW<br> | '''Nameplate capacity:''' Phase I: 1320 MW; Phase II: 1320 MW<br> | ||
'''Type:''' [[Supercritical]]<ref name=thermal/><br> | '''Type:''' [[Supercritical]]<ref name=thermal/><br> |
Latest revision as of 01:52, 29 August 2015
{{#Badges:CoalSwarm|navbar-Indiacoal}}Gudur Thermal Power Project (Momidi) is a proposed coal plant in Andhra Pradesh, India.
Location
The map below shows the location of Chillakur mandal, Nellore district, Andhra Pradesh, the approximate location where the power plant would be built.
Background
Gudur Thermal Power Project (Momidi) is a proposed 2640 megawatt (MW) coal plant in Momidi, Chillakkur mandal, Nellore district. The project is planned in two phases, each 1320 MW.[1] The project was issued a Term of Reference (ToR) on September 9, 2010.[1] In 2011 the company applied for consideration under the Clean Development Mechanism. The company argued that the plant would be significantly more efficient than the norm for India:[2]
- The Central Electricity Authority (CEA) has estimated the efficiency of subcritical power plants to be 32.63% based on the normative Gross Heat Rate of 2450 kcal/kWh in India. The estimated station heat rate in the project activity will be around 2176 kcal/kWh2. Based on this data, it is evident that the efficiency of power plants using supercritical technology would be more efficient in comparison to the power plants using subcritical technology.
Since 2011, there have been no reports of further development of the project and no applications for further environmental clearances. The project appears to be shelved or cancelled.
Project Details
Sponsor: Pragdisa Power Private Ltd
Parent company: Lanco Group
Location: Momidi village, Chillakur mandal, Nellore district, Andhra Pradesh
Coordinates: 14.130902, 79.864683 (approximate)
Status: Cancelled
Nameplate capacity: Phase I: 1320 MW; Phase II: 1320 MW
Type: Supercritical[1]
Projected in service:
Coal Source: Domestic (70%) and imported (30%) coal[1]
Estimated annual CO2:
Source of financing:
Permits: Terms of reference, India MoEF, Sep 9, 2010.
Resources and articles
Related SourceWatch articles
References
- ↑ 1.0 1.1 1.2 1.3 "2640 MW Gudur TPP near Momidi Village, by Pragdisa Power Pvt. Ltd.," Thermal MoEF News, July 13, 2011
- ↑ "CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD), Gudur Thermal Power Project," March 18, 2011