Difference between revisions of "Rampur coal plant"
(location) |
|||
Line 3: | Line 3: | ||
==Location== | ==Location== | ||
The map below shows the village of Rampur, but not the exact location of the project: | The map below shows the village of Rampur, but not the exact location of the project: | ||
− | {{#display_point: | + | {{#display_point:17.53, 73.52|width=500|height=400|type=normal|zoom=8}} |
==Background== | ==Background== | ||
Line 11: | Line 11: | ||
==Project Details== | ==Project Details== | ||
'''Sponsor:''' [[Finolex]]<br> | '''Sponsor:''' [[Finolex]]<br> | ||
− | '''Location:''' Rampur village, Ratnagiri district, Maharashtra state, India<br> | + | '''Location:''' Rampur village, Chiplun taluk, Ratnagiri district, Maharashtra state, India<br> |
− | '''Coordinates:''' <br> | + | '''Coordinates:''' 17.53, 73.52, approximate<br> |
'''Status:''' Cancelled<br> | '''Status:''' Cancelled<br> | ||
'''Nameplate capacity:''' 1000 MW<br> | '''Nameplate capacity:''' 1000 MW<br> |
Revision as of 18:11, 25 April 2014
{{#badges: CoalSwarm|Navbar-Indiacoal}} Rampur coal plant was a proposed coal plant in Maharashtra, India.
Contents
Location
The map below shows the village of Rampur, but not the exact location of the project:
Background
The Rampur coal plant was a proposed 1,000 megawatt (MW) coal-fired power station planned by Finolex for Rampur, in the Ratnagiri district of Maharashtra, India.[1] Maharashtra is among India’s most industrialized states, and representatives say they are seeking to make the state an "attractive investment destination" for manufacturers to maintain its primacy in the sector.[2] In 2008 news items reported that Finolex Cables planned to set up a 1000 MW coal plant on land held by its sister company, Finolex Industries. The project would come on the heels of a 43 MW captive coal plant at Finolex's PVC manufacturing plant in Ranagiri. Under the plan for the 1000 MW plant, Finolex would convert its fair-weather port into an all-season port, allowing coal to be imported from Indonesia.[3]
In 2011, news reports stated that Finolex was in talks with Chinese and Indian companies to sell its stake in the project.[4] In the absence of subsequent reports on the project, it appears to have been abandoned.
Project Details
Sponsor: Finolex
Location: Rampur village, Chiplun taluk, Ratnagiri district, Maharashtra state, India
Coordinates: 17.53, 73.52, approximate
Status: Cancelled
Nameplate capacity: 1000 MW
Type:
Projected in service:
Coal Type:
Coal Source: Indonesia
Estimated annual CO2:
Source of financing:
Resources
References
- ↑ "Western Ghats" Environmental Information Centre, accessed Oct. 2011.
- ↑ Makarand Gadgil, "R-Power wants to scrap Raigad power project" Wall Street Journal, Sep. 10, 2011.
- ↑ Promit, Mukherjee, "Cables to spearhead Finolex power foray," DNA, May 14, 2008
- ↑ "Finolex Cables eyes JV partner for thermal plant at Ratnagiri," Prospering Indian Power Sector (blog), August 9, 2011