Difference between revisions of "Gudur Thermal Power Project (Momidi)"

From SourceWatch
Jump to navigation Jump to search
(SW: added map)
(SW: gps)
Line 10: Line 10:
 
'''Sponsor:''' [[Pragdisa Power Private Ltd]]<br>
 
'''Sponsor:''' [[Pragdisa Power Private Ltd]]<br>
 
'''Location:''' Momidi village, Chillakur mandal, Nellore district, Andhra Pradesh<br>
 
'''Location:''' Momidi village, Chillakur mandal, Nellore district, Andhra Pradesh<br>
'''Coordinates:''' <br>
+
'''Coordinates:''' 14.130902, 79.864683 (approximate)<br>
 
'''Status:''' Proposed<br>
 
'''Status:''' Proposed<br>
 
'''Nameplate capacity:''' Phase I: 1320 MW; Phase II: 1320 MW<br>
 
'''Nameplate capacity:''' Phase I: 1320 MW; Phase II: 1320 MW<br>

Revision as of 18:58, 18 March 2012

{{#Badges:CoalSwarm|navbar-Indiacoal}}Gudur Thermal Power Project (Momidi) is a proposed 2640 megawatt (MW) coal plant in Momidi, Chillakkur mandal, Nellore district, Andhra Pradesh, India. The project is planned in two phases, each 1320 MW.[1]

The project was issued a Term of Reference (ToR) on September 9, 2010.[1]

Location

The map below shows the location of Chillakur mandal but not the exact location of the project.

Project Details

Sponsor: Pragdisa Power Private Ltd
Location: Momidi village, Chillakur mandal, Nellore district, Andhra Pradesh
Coordinates: 14.130902, 79.864683 (approximate)
Status: Proposed
Nameplate capacity: Phase I: 1320 MW; Phase II: 1320 MW
Type: Supercritical[1]
Projected in service:
Coal Source: Domestic (70%) and imported (30%) coal[1]
Estimated annual CO2:
Source of financing:

Resources and articles

Related SourceWatch articles

References