Difference between revisions of "Chandrapur CESC power station (Tadali)"
Cshearer19 (talk | contribs) (SW: add section) |
m (SW: typo) |
||
Line 12: | Line 12: | ||
'''Nameplate capacity:''' 600 MW (2 x 300 MW)<br> | '''Nameplate capacity:''' 600 MW (2 x 300 MW)<br> | ||
'''Type:''' <br> | '''Type:''' <br> | ||
− | '''Projected in service:''' < | + | '''Projected in service:''' 2013<br> |
'''Coal Source:''' SECL<br> | '''Coal Source:''' SECL<br> | ||
'''Estimated annual CO<sub>2</sub>:''' <br> | '''Estimated annual CO<sub>2</sub>:''' <br> |
Revision as of 22:01, 7 June 2012
{{#Badges:CoalSwarm|navbar-Indiacoal}}Chandrapur CESC power station (Tadali) is a proposed 600 megawatt (MW) coal plant in Maharashtra state, India. CESC has acquired a controlling stake in Dhariwal Infrastructure which initiated the project. As of August 2009, CESC reported that 450 acres of land was in hand for the project, that the coal linkage with SECL had been secured, that the water supply agreement had been executed, that environmental clearance with the Ministry of Environment and Forests (MoEF) has expected shortly, and that transmission clearance had been secured. Financial closure was expected by the end of 2009, and ground breaking was planned for March 2010.[1] In January 2012, CESC told investors that the project was "fully under implementation" and would be completed in 2013.[2]
Contents
Location
The map below shows the district of Tadali, but not the exact location of the project:
Project Details
Sponsor: CESC
Location: Tadali Industrial Area, 11 km from Chandrapur in Maharashtra state, India
Coordinates:
Status: Under construction
Nameplate capacity: 600 MW (2 x 300 MW)
Type:
Projected in service: 2013
Coal Source: SECL
Estimated annual CO2:
Source of financing:
Resources and articles
Related SourceWatch articles
References
- ↑ [ http://bit.ly/xDrWcp "CESC to set up 600 MW Thermal Power Project in Maharashtra,] CESC, August 28, 2009
- ↑ "Projects in the pipeline," CESC investor presentation (PDF), January 2012