Difference between revisions of "Gudur Thermal Power Project (Momidi)"

From SourceWatch
Jump to navigation Jump to search
(SW: gps)
(→‎Location: map fix)
Line 5: Line 5:
 
==Location==
 
==Location==
 
The map below shows the location of Chillakur mandal but not the exact location of the project.
 
The map below shows the location of Chillakur mandal but not the exact location of the project.
{{#display_point:|Chillakur, Andhra Pradesh, India|width=500|height=400|type=normal|zoom=7}}
+
{{#display_point:Chillakur, Andhra Pradesh, India|width=500|height=400|type=normal|zoom=7}}
  
 
==Project Details==
 
==Project Details==

Revision as of 20:00, 23 August 2012

{{#Badges:CoalSwarm|navbar-Indiacoal}}Gudur Thermal Power Project (Momidi) is a proposed 2640 megawatt (MW) coal plant in Momidi, Chillakkur mandal, Nellore district, Andhra Pradesh, India. The project is planned in two phases, each 1320 MW.[1]

The project was issued a Term of Reference (ToR) on September 9, 2010.[1]

Location

The map below shows the location of Chillakur mandal but not the exact location of the project.

Project Details

Sponsor: Pragdisa Power Private Ltd
Location: Momidi village, Chillakur mandal, Nellore district, Andhra Pradesh
Coordinates: 14.130902, 79.864683 (approximate)
Status: Proposed
Nameplate capacity: Phase I: 1320 MW; Phase II: 1320 MW
Type: Supercritical[1]
Projected in service:
Coal Source: Domestic (70%) and imported (30%) coal[1]
Estimated annual CO2:
Source of financing: