'''Bander power station''' is coal-fired power station in Andhra Pradesh being developed in two phases by [[Thermal Powertech Corporation]]. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW.<ref name=Details/>
+
'''Bander power station''' is a coal-fired power station currently being developed in Andhra Pradesh.
  
 
{{#display_point:14.3418, 80.1489|width=500|height=400|type=satellite|zoom=13}}
 
{{#display_point:14.3418, 80.1489|width=500|height=400|type=satellite|zoom=13}}
 
+
==Background==
 +
'''Bander power station''' is a coal-fired power station in Andhra Pradesh being developed in two phases by [[Thermal Powertech Corporation]]. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW.<ref name=Details/>
 
==Project Details==
 
==Project Details==
 
'''Sponsor:''' [[Thermal Powertech Corporation]]<br>
 
'''Sponsor:''' [[Thermal Powertech Corporation]]<br>
Line 26: Line 27:
 
*[[Proposed coal plants in India]]
 
*[[Proposed coal plants in India]]
  
 +
 +
 +
===External resources===
 +
 +
 +
===External articles===
 
{{#display_points:
 
{{#display_points:
|center=22,82.43
+
center=22,82.43
 
|width=400
 
|width=400
 
|height=350
 
|height=350
Line 45: Line 52:
 
13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.;
 
13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.;
 
26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.;
 
26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.;
22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information.;
+
22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information.
 
|zoom=4
 
|zoom=4
 
}}
 
}}
 
===External resources===
 
 
 
===External articles===
 
 
  
 
[[Category:Proposed coal plants in Andhra Pradesh]]
 
[[Category:Proposed coal plants in Andhra Pradesh]]

Revision as of 18:20, 28 August 2012

{{#badges: CoalSwarm|Navbar-Indiacoal}}

Bander power station is a coal-fired power station currently being developed in Andhra Pradesh.

Background

Bander power station is a coal-fired power station in Andhra Pradesh being developed in two phases by Thermal Powertech Corporation. Phase-I is 660 megawatts (MW), and Phase-II is also 660 MW.[1]

Project Details

Sponsor: Thermal Powertech Corporation
Location: Krishnapatnam, Mutukur Mandal, SPS Nellore District of Andhra Pradesh
Coordinates: between 80°08'35.956’’E & 14°19'5.211’’N and 80°09'16.325’’E &14°21'0.874’’N
Status: Proposed
Nameplate capacity: 1320 MW (Phase-I 660 MW; Phase-II 660 MW)
Type: Supercritical
Projected in service: Phase-I mid-2013; Phase-II end-2013
Coal Type:
Coal Source: Imported coal will be transported by ship to Krishnapatnam Port. Indigenous coal will be brought by rail from Ib Valley/Talcher to Paradip/ Dhamra Port and then transported by sea to Krishnapatnam Port[1]
Estimated annual CO2: 798,350 tons[2]
Source of financing:

Articles and resources

References

  1. Jump up to: 1.0 1.1 "Project Details," Thermal Power Corporation website, accessed January 2012
  2. For estimation method, see Estimating carbon dioxide emissions for proposed coal plants in India

Related SourceWatch articles


External resources

External articles