Pudimadaka Ultra Mega Power Project

From SourceWatch
Jump to navigation Jump to search

{{#badges: CoalSwarm|Navbar-Indiacoal}} Pudimadaka Ultra Mega Power Project is a proposed 4,000-megawatt coal-fired power station by NTPC in Andhra Pradesh, India.

Location

The map below shows the location of Pudimadaka village but not the exact location of the project.

Background

In January 2014 project sponsor NTPC said it was planning on fast-tracking the project. The project was initially to use domestic coal, but facing difficulty in securing a coal linkage, it may use imported coal. NTPC is awaiting land clearance from the state government, and will then seek the necessary permits, after which it will take an estimated 42 months to implement the five 800 MW units.[1]

Project Details

Sponsor: NTPC
Location: Pudimadaka village near Anakapalle, Andhra Pradesh, India
Coordinates: 17.492713, 83.002767 (approximate)
Status: Announced
Nameplate capacity:

  • Unit 1: 800MW
  • Unit 2: 800MW
  • Unit 3: 800MW
  • Unit 4: 800MW
  • Unit 5: 800MW

Type: Supercritical
Projected in service:
Coal Type:
Coal Source:
Estimated annual CO2:
Source of financing:

Articles and resources

References

  1. "NTPC seeks to fast track Pudimadaka project," The Hindu Online, Jan 29, 2014.