Amravati Thermal Power Project

From SourceWatch
Jump to navigation Jump to search

{{#Badges:CoalSwarm|navbar-Indiacoal}} Amravati Thermal Power Project is a 1350-megawatt (MW) coal-fired plant in Maharashtra, India.

An additional phase II and III have been proposed.

Location

The undated satellite photo below shows the power station, which is located north of the village of Nandgaonpeth in Amravati district, Maharashtra.

Background

Phase I

The proposed project by RattanIndia Power Ltd (formerly Indiabulls Power Ltd) would consist of three stages. Stage I would comprise five 270 MW units. For Stage I, the first unit of 270 MW was completed on March 25, 2013, and the second February 17, 2014.[1][2] The next three units three units are expected to be operational in FY 2014.[3]

In 2011 the company said that coal linkage had been granted and that "letters of assurance from South Eastern Coalfields Ltd. (SECL), Western Coalfields Ltd. (WCL) and Mahanadi Coalfields Ltd. (MCL) have been issued."[4]

The company stated in 2012 that the project had achieved financial closure, and "construction is in full swing."[5]

Units 3-5 were commissioned by RattanIndia Power Ltd in February and March 2015. The company also laid a new railway track between Walgaon and the power plant for direct coal supply from South Eastern Coalfields Limited, a subsidiary of Coal India.[6]

Phases II and III

According to the Central Electricity Authority, Phase II consists of five units of 270 MW each, rather than two units of 660 MW each as described by Indiabulls.[1] Phase II received environmental clearance in 2011.[7]

The company also received a terms of reference for a stage III of a further 1320 MW in 2009,[8] although stage III is not mentioned in 2014 news updates on the project[9][3] and appears to be cancelled.

Ownership

As of July 2014, there are talks of Adani Power acquiring the power project from owner RattanIndia Power Ltd.[9]

Opposition

In 2010 activists affiliated with Upper Wardha Paani Bachao Kruti Samiti (a campaign to save water of the Upper Wardha dam) stalled work on the power station, opposing the diversion of irrigation water from the Upper Wardha to the project.[10]

Project Details

Sponsor: RattanIndia Power Ltd (formerly Indiabulls Power Ltd)
Location: Nandgaonpeth, Amravati district, Maharashtra
Coordinates: 21.0803156, 77.9012418 (exact)
Status:

  • Phase I, Unit 1: commissioned March 25, 2013
  • Phase I, Unit 2: commissioned February 17, 2014
  • Phase 1, Units 3-5: commissioned February-March 2015
  • Phase II: Construction
  • Phase III: Cancelled

Capacity:

  • Phase I: 1350 MW (five units, each 270 MW)
  • Phase II: 1350 MW (five units, each 270 MW)
  • Phase III: 1320 MW (two units, 660 MW)

Type:

Projected in service: Coal Type:
Coal Source:
Estimated annual CO2:
Source of financing:
Permits and applications:

Articles and resources

References

  1. Jump up to: 1.0 1.1 Monthly Report on Broad Status of Thermal Power Projects in the Country, Central Electricity Authority, February 2014
  2. Thermal Power Project: Amravati, Indiabulls website, accessed November 2012
  3. Jump up to: 3.0 3.1 "Rajiv Rattan to invest Rs360 crore in Indiabulls Power," Live Mint, Sep 8, 2014.
  4. Indiabulls Power, "Amravati Thermal Power Project", Indiabulls Power website, accessed November 2011.
  5. "Robust results for Indiabulls Power in FY 2011-12," Indiabulls press release, April 28, 2012
  6. "Amravati plant attains full capacity," Times of India, Mar 30, 2015
  7. Environmental Clearance, India MoEF, May 27, 2011
  8. Terms of Reference, India MoEF, December 2, 2009.
  9. Jump up to: 9.0 9.1 Piyush Pandey,"Adani eyes Indiabulls' 1,350 MW Amravati Thermal Power Project," TNN, July 30, 2014.
  10. "Protesters stall work on thermal project in Amravati," The Hindu, Jan 27, 2010.