Kao Hin Son power station
This article is part of the CoalSwarm coverage of Thailand and coal | |
Sub-articles: | |
Related articles: | |
Kao Hin Son power station, also known as the Chachoengsao power station, is a proposed 600-megawatt (MW) coal-fired power station planned for Phanom Sarakham, Thailand.
Contents
Location
The map below shows the location of Phanom Sarakham, the approximate location where the plant will be built.
Background on Plant
In 2007, Advance Agro (AA) (now Double A Power) won an auction to build a 600 MW coal-fired power plant in the Khao Hin Son Sub-District, Phanom Sarakham District. After the license was granted, a new constitution was approved in 2007 with a law mandating environmental and health impact assessments (EHIAs) be conducted before operations could begin.
Local villagers expressed various concerns and held protests and eventually petitioned the King, citing health concerns over the power station. In October 2013 project sponsor NPS again did not get needed approval documents for the station.[1]
According to the Thailand Power Development Plan for 2012-2030, and 2015-2025, Units 1 and 2 will begin operating in November 2016, and Units 3 and 4 will begin operating in March 2017.[2][3]
In January 2016 the environmental and health impact assessment (EHIA) for the project was rejected by the Thailand Environmental Expert Commission. It was the third time the EHIA was submitted. The sponsor was listed as Double A Company.[4][5]
In April 2017 EGAT said a new 1,300MW gas-fired plant "will be installed in the same 8-hectare site of the terminated Kao Hin Son coal plant in Chachoengsao province". The new Bang Pakong Power Plant is scheduled to go into commercial operation in April 2019, and use both domestic and imported gas.[6]
However, the Thailand Power Development Plan for 2018-2037 again includes plans for the Kao Hin Son coal plant, along with two "replacement" coal units at the Mae Moh power station. It is planned for commissioning sometime between 2026 and 2037. The Plan was approved in January 2019.[7]
In July 2019, it was reported the Electricity Generating Authority of Thailand (Egat) was speeding up the process for the long-delayed coal plant under the direction of newly appointed Energy Minister Sontirat Sontijirawong. The plant would be built by National Power Supply, owned by Double A Power, the same company granted an operating license for the plant in 2007. NPS also asked the Energy Ministry to consider the possibility of shifting the fuel for power generation from coal to natural gas.[8]
Project Details
- Sponsor: Double A Power
- Location: Phanom Sarakham, Chachoengsao Province
- Coordinates: 13.744722, 101.347222 (approximate)
- Status: Announced
- Gross Capacity: 600 MW (Units 1-4: 150 MW)
- Type: Subcritical
- Projected in service:
- Coal Type:
- Coal Source:
- Source of financing:
Articles and resources
References
- ↑ "Food Security defeated Double A’s Dirty Coal Proposal," Thailand Coal Network, Oct 22, 2013.
- ↑ "Summary of Thailand Power Development Plan 2012-203, Revision 3," Ministry of Energy, June 2012, Table 4.1
- ↑ "Thailand Power Development Plan, 2015-2036," Thailand Ministry of Energy, May 2015
- ↑ "ดับฝันดั๊บเบิ้ล เอ รอบ 3 EHIA โรงไฟฟ้าถ่านหินเขาหินซ้อน," Greenpeace, Jan 14, 2016
- ↑ "Future Operation," Double A Power website, March 18, 2017 (at Wayback Machine)
- ↑ "Cabinet approves investment in new Bang Pakong power plant," April 5, 2017
- ↑ "Power plan backed along wIth 2 plants," The Nation, January 25, 2019
- ↑ "Egat moves coal plant along," Bangkok Post, July 17, 2019