{{#Badges:CoalSwarm|navbar-Indiacoal}}JSW Barmer (Jalipa Kapurdi) power station is a partly commissioned coal-fired power station in Rajasthan, India. It is proposed by JSW Energy subsidiary Raj West Power.

A "Phase I" of 8x135 MW units was completed in 2013. An additional 660 MW has been proposed.

Location

The photo below shows the project in Barmer district, near the village of Bhadresh.

Loading map...

Phase 1: 1080 MW

Units 1-8 have been commissioned as follows:

  • Unit 1 - 135 MW - October 2010[1]
  • Unit 2 - 135 MW - July 2010[1]
  • Unit 3 - 135 MW - November 2011[2]
  • Unit 4 - 135 MW - November 2011[2]
  • Unit 5 - 135 MW - commissioned February 2013[3]
  • Unit 6 - 135 MW - commissioned March 2013[3]
  • Unit 7 - 135 MW - commissioned March 2013[3]
  • Unit 8 - 135 MW - commissioned February 2013[3]

In a January 2012 presentation to investors, JSW Energy stated the entire first phase of the plant (8x135MW) will be completed in 2012. Actual completion was in early 2013. The company stated that it has entered into a "long term arrangement for entire capacity with state government distribution utilities."[4]

Expansion

With phase 1 of the plant nearing completion, JSW is seeking approval for the construction of an additional two 135MW units on the same parcel of land. In a January 2012 presentation to investors, JSW Energy stated that it had applied to the Ministry of Coal for an additional coal linkage and that it was awaiting government approval for the project.[5]

In August 2014, the company said on its website that it possessed the necessary land for the project.[6]

In February 2015 Raj West Power received a terms of reference to expand the power station by one 660 MW unit.[7] In November 2015 Raj submitted an EIA for the project.[8]

With no developments since the 2015 application, plans for the expansion appear to be abandoned.

Coal supply

On its website, JSW states that "Rajasthan State Minerals and Mining Ltd. and Raj WestPower Limited have collaborated to setup a joint venture company, Barmer Lignite Mining Company Limited (BLMCL). This is the first and largest public- private partnership in the State of Rajasthan. It shall be mining and supplying Lignite from Jalipa and Kapurdi mines to Raj West Power Ltd. The major part of the land required for the power project has already been purchased and the site activities have commenced. The water required for the project is piped 185 kilometers from Indira Gandhi National Project (IGNP) for which water supply agreement has also been signed."[9]

Water

The water required for the project is piped 185 kilometers from Indira Gandhi National Project (IGNP).[9]

Citizen Opposition

Fearing the loss of their source of livelihood, farmers in the local area have blocked government officials from entering hamlets to collect data on villages and holdings. Resistance began during the development of the first phase of the project, with farmers forming an anti-acquisition group and filing a petition against Raj West Power in the Jodhpur bench of the Rajasthan High Court. The petition cited lack of measures to mitigate environmental and social impacts.[10]

Contact details

308 - 311, Gitanjali Towers,
Bomba Walo ka Baug,
Ajmer Road
Jaipur - 302006

Project Details

Sponsor: Raj West Power Limited (RWPL)
Parent: JSW Energy
Location: near Bhadresh village, Barmer district, Rajasthan
Coordinates: 25.89494, 71.3256454 (exact)
Status:

  • Units 1-8: Operating
  • Unit 9: Cancelled

Nameplate capacity:

  • Units 1-8: 1080 MW (8 x 135 MW)
  • Units 9: 660 MW

Type: Circulating fluidized bed
Projected in service: Phase I: 2012/2013
Coal Type: Lignite
Coal Source: Lignite from nearby Jalipa and Kapurdi mines as well as coal from Indonesia[3]
Estimated annual CO2: 6,386,797 tons
Source of financing:
Permits and applications

Resources and articles

Related SourceWatch articles

References

  1. 1.0 1.1 JSW Barmer (Jallipa-Kapurdi) Coal Power Plant India, accessed February 1, 2012
  2. 2.0 2.1 "India Central Electricity Authority Monthly Report," India Central Electricity Authority, November 2011
  3. 3.0 3.1 3.2 3.3 3.4 Monthly Report on Broad Status of Thermal Power Projects in the Country, Central Electricity Authority, August 2013 Cite error: Invalid <ref> tag; name "broad" defined multiple times with different content
  4. JSW Energy, "Energising India", Investor presentation, January 2012, page 20. (Pdf)
  5. JSW Energy, "Energising India", Investor presentation, January 2012, page 24. (Pdf)
  6. "Projects under implementation and development," JSW website, accessed August 2014
  7. Terms of Reference, India MoEF, Feb 25, 2015
  8. EIA, JSW Energy, Nov 2015
  9. 9.0 9.1 JSW, "Raj West Power", JSW website, accessed November 2011.
  10. "Barmer farmers protest Jindal power project," India Environmental Portal, 28 February 2008
Loading map...

External resources