Zheneng Liuheng power station
(Redirected from Liuheng Power Plant)
Jump to navigation
Jump to search
{{#badges:CoalSwarm|Navbar-Chinacoal}}Zheneng Liuheng power station (浙能中煤舟山煤电公司六横发电厂) is a 2,000-megawatt (MW) coal-fired power plant in Zhejiang Province, China.
Contents
Location
The photo below shows the plant in Liuheng Town (Liuhengzhen), Putuo District, Zhoushan Prefecture, Zhejiang Province.
Loading map...
Background on Project
Zheneng Liuheng power station is a two-unit coal-fired power plant with a total capacity of 2,000 MW in Zhejiang Province. The plant began operating in 2014.[1] [2][3]
Project Details
- Sponsor: Zhejiang Provincial Energy Group (56%), ChinaCoal (27%), Other (10%), Liqin Investment Company (7%)
- Location: Liuheng Town (Liuhengzhen), Putuo District, Zhoushan Prefecture, Zhejiang Province, China
- Coordinates: 29.7593387, 122.1266091 (exact)
- Status: Operating
- Gross capacity: 2,000 MW (Units 1 & 2: 1,000 MW)
- Type: Ultra-Supercritical
- In service: 2014
- Coal type: Bituminous
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "各大媒体竞相报道六横电厂1号机组正式商业投产", 浙江省能源集团有限公司, 2014-07-11
- ↑ "浙能六横电厂1号燃煤发电机组投运 实现超低排放", 浙江在线, 2014-07-10
- ↑ "国内首家新建超低排放电厂——浙能六横电厂2号机组圆满通过168小时," CECX, 2014-09-18