Shanxi Dongda Coal Mine
{{#badges:CoalSwarm|Navbar-Chinacoal}} Shanxi Dongda Coal Mine (山西煤炭运销集团东大能源有限公司东大煤矿) is located in Zhengzhuang Town of Shanxi. Its annual production capacity is designed to be 5 million tonnes(Mt) a year.
Contents
Location
The undated satellite photo below shows the coal mine located in Dongda Village, Zhengzhuang Town, Qinshui, Shanxi.
Coal Mine Background
In May 2015, the National Development and Reform Commission (NDRC) has ratified the construction of Dongda Coal Mine with a total production of 5Mt/year.[1]
On February 14th 2018, Dongda Coal Mine received the exploitation license issued by Ministry of Land and Resources of Shanxi Province.[2]
The construction of Dongda Coal Mine project began in September 2018. The project is expected to be completed and put into operation in 2021.[3]
Project Details
- Sponsor: Shanxi Coal Transportation and Sale Group Dongda Energy Co.
- Parent Company: Jinneng Group
- Location: Dongda Village, Zhengzhuang Town, Qinshui, Shanxi
- GPS Coordinates: 35.726066,112.424415
- Status: Constructing
- Production Capacity: 5 Mt/year
- Total Resource: 887.27Mt[4]
- Minable Reserves: 422Mt
- Coal Type: Bituminous
- Mine Size: 117.2441k㎡[5]
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "山西晋城矿区东大煤矿项目通过核准"发改委, 2015/05/18
- ↑ "东大煤矿获得采矿许可证"晋能集团, 2018/02/26
- ↑ "山西首个新立煤矿项目开工建设"新华网, 2018/09/17
- ↑ "山西两大煤企联手合作500万吨/年大型煤炭项目开工"中国能源网,2018/09/14
- ↑ "东大煤矿获得采矿许可证"晋能集团, 2018/02/26