* [[Kozienice Power Station]] is a coal-fired thermal power station in Świerże Górne near Kozienice, Poland. It is Poland's second largest power station with an installed capacity of 2,820 MW (ten units). It is owned by Grupa Energetyczna Enea SA (Enea).<ref>[http://www.elko.com.pl/elkoweb/site2/site.php?module=page&cmd=show§ion_code=ABOUT_US&code=about3&id_section=4 "Enea: About Us: Power Plant specifications,"] Enea website, accessed September 2012.</ref> Enea plans for an additional €1.3 billion coal-fired unit at the station with an installed capacity of 1000 MW. Construction will start in 2012. Enea group has also signed a PLN 22.5 million (€5.2 million) coal supply agreement with Bogdanka coal mine, expiring in 2036.<ref>[http://www.cleantechpoland.com/en/fossil-fuels/coal-fossil-fuels/enea-to-start-a-1000mw-coal-fired-project-in-2012/ "Enea to start a 1000MW coal-fired project in 2012,"] Cleantech Poland, January 24, 2012.</ref>
*[[Leczna Power Station]] is a proposed 800 MW coal station by [[GDF Suez]] Energia Polska for Poland, near the Ukraine border. As of 2011 there is no visible construction, and the plant may be an alternative for the proposed [[Lublin Power Station]] in Poland.<ref>[http://www.clientearth.org/reports/pl-national-investments-plan-analysis.pdf "ClientEarth Summary Briefing of Analysis of Polish National Investment Plan for Article 10c) ETS Directive application for transitional free allowances,"] ClientEarth Summary Briefing, July 2, 2012.</ref>
*[[Lublin Power Station]] is a proposed 136MW coal plant announced in June 2010 by [[Polska Grupa Energetyczna]] SA, Poland’s largest power utility, and the Polish unit of France’s [[GDF Suez]]. Each company will own 50 percent of the coal-fired plant to be built, while the capacity or value for the venture remain unknown.<ref>Nathaniel Espino, [http://www.businessweek.com/news/2010-06-16/poland-s-pge-gdf-suez-agree-to-build-coal-fired-power-plant.html "Poland’s PGE, GDF Suez Agree to Build Coal-Fired Power Plant"] Bloomberg BusinessWeek, June 16, 2010.</ref> It is scheduled to be completed in 2018.<ref>[http://www.pgesa.pl/en/InvestorRelations/Documents/PGE%20Group%20strategy%202012_2035_presentation.pdf "Creating value and safe future PGE Group Strategy 2012-2035,"] PGE, Feb. 2012.</ref>