In 2011 it was reported that CIIDG Erdos Hongjun Electric Power Co. had been set up as a China-Cambodia joint venture granted permission by the Royal Government of Cambodia to develop a 7 x 135MW coal-fired power project in Sihanoukville in order to generate the electricity to be supplied to the national grid.<ref>[https://groups.yahoo.com/neo/groups/itc-engineering-2004/conversations/topics/393 "itc-engineering-2004,"] yahoo groups, accessed Feb 2015</ref>
In 2013 it was reported that the Chinese manager on the construction of a coal-fired power plant in Preah Sihanouk province was stabbed to death. The project was a 405-MW power plant in Stung Hav district by Chinese-Cambodian CIIDG Erdos Hongjun Electric Power Co.<ref>[https://www.cambodiadaily.com/archives/chinese-power-plant-worker-stabbed-to-death-in-preah-sihanouk-33600/ "Chinese Power Plant Worker Stabbed to Death in Preah Sihanouk,"] The Cambodian Daily, July 5, 2013</ref>
==Project Details==
*'''Sponsor:''' Cambodian International Development GroupCIIDG Erdos Hongjun Electric Power Co.
*'''Parent company:'''
*'''Developer:'''
*'''Location:''' Stung Hav district, Sihanoukvilleprovince, Cambodia
*'''Coordinates:''' 10.6333, 103.5 (approximate)
*'''Status:''' CancelledConstruction*'''Capacity:''' 270 405 MW (2 x 135 MW)
*'''Type:''' [[Subcritical]]
*'''Start date:'''