'''Crystal River Energy Complex''' is a 2,443-megawatt (MW) coal-fired power station owned and operated by [[Progress Energy]] near Crystal River, Florida.
Units A new 1,640-megawatt CCGT plant is planned to be built on 400 acres of land adjacent to the company’s Crystal River complex and would start producing electricity in 2018. Two coal-fired units at Crystal River, units 1-2 totaling 965 MW, are planned expected to be retired in 2016shut down that same year.<ref>Jim Saunders, [httpshttp://www.eiajacksonville.govcom/electricitybusiness/data2014-05-14/eia860story/ Form EIAduke-energy-florida-plans-scrap-coal-power-plants-switch-860 Data natural- Schedule 3gas "Duke Energy Florida plans to scrap coal power plants, switch to natural gas, 'Generator Data'"] US EIANews Service of Florida Wed, May 14, 2014</ref>