Saggonda power station

76 bytes added, 02:01, 27 May 2016
no edit summary
According to the company's 2014 annual report:<ref>[http://www.aceanalyser.com/ar/AR2014/190062_201403.pdf "Annual Report,"] Andhra Sugars, 2014</ref>
:"a Coal Based Power Project is being set up at the Chemical Complex at Saggonda. 40 acres of land have been procured. Details for the Power Project have been prepared. The total capital cost of the project has been estimated at Rs. 193.50 Crores. Technical evaluation of Turbine package has been completed and final offers are awaited from vendors. Technical evaluation of Equipment offers are under progress and expected to be completed shortly. A public hearing by the Andhra Pradesh Pollution Control Board is yet to take place, after which purchase orders will be released. The Power generated from this Power Plant will be utilised for the Chemical Plants located at Saggonda." The size of the plant is not mentioned.
 
However, with no developments since 2014, the project appears to be shelved or abandoned.
==Project Details==
'''Location:''' Saggonda village, West Godavari district, Andhra Pradesh<br>
'''Coordinates:''' 16.430000, 81.090000 (approximate)<br>
'''Status:''' Pre-permit developmentShelved<br>
'''Nameplate capacity:''' 120 MW <br>
'''Type:''' <br>