The Boryeong power station consists of 8 coal-fired units of 500 MW each, built from 1983 to 2008, for a combined capacity of 4,000 MW. The scrubbers on Units 3-6 were retrofitted in the late 1990s. It is owned by KOMIPO.<ref>[http://www.industcards.com/st-coal-korea.htm "Coal-Fired Power Plants in South Korea,"] Industcards, accessed Feb 2015</ref>
Units 1-2, which are subcritical, are were planned for retirement in 2025.<ref>[http://www.motie.go.kr/motie/ne/presse/press2/bbs/bbsView.do?bbs_seq_n=158375&bbs_cd_n=81 "30년 이상 노후 석탄발전 10기 폐지,"] motie, 2016-07-06</ref> In May 2017 President Moon Jae-in said the two units will be shut down by 2022.<ref>[http://english.hankyung.com/photo/2017/05/31/1728401/korea-to-permanently-shut-down-3-old-coal-power-plants-by-years-end "Korea to Permanently Shut down 3 Old Coal Power Plants by Year's End,"] Korea Economic Daily, May 31, 2017</ref>
==Project Details==