{{CoalSwarm}}The '''GreenGen power station''' (华能天津IGCC示范电站一期) is a 250-megawatt (MW) integrated gasification combined cycle (IGCC) power plant and proposed 800 MW carbon capture and storage (CCS) plant in Tianjin, China.
GreenGen was originally seen as a follow-up to the US's [[FutureGen]],<ref name=jt/> which has been cancelled.
==Location==
The third phase will be an 800-megawatt power plant with full-scale [[carbon capture and storage]] in underground rock layers.<ref>[http://www.thea.gov.cn/tzlg/a/2012-12-13/1365667288571.shtml "领先世界水平的华能天津IGCC电站示范工程正式投产,"] Tianjin Harbor Economic Area, 2012-12-13</ref> The original planned completion date was 2015 but was then pushed back to 2020.<ref name=jt/> The CO2 may be used for [[enhanced oil recovery]] at the Tianjing Dagang oil field.<ref name=gccs/>
As of November 2019 there have been no further developments on GreenGen was originally seen as a follow-up , and the project appears to the US's [[FutureGen]],<ref name=jt/> which has been cancelledbe shelved.
==Project Details==
*'''Location:''' Lingang Industrial Park, Binhai New Area, Tianjin, China
*'''Coordinates:''' 38.92504, 117.727091 (exact)
*'''Status:''' Operating (coal gasification unit); Pre-permit development Shelved (CCS unit)