Guangdong Zhongshan power station
(Redirected from Zhongshan Sugar power station)
Jump to navigation
Jump to search
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Guangdong Zhongshan power station (粤海控股中山火电厂) is a 600-megawatt (MW) coal-fired power plant in Guangdong Province, China.
Contents
Location
The photo shows the plant in Huangpu Town.
Loading map...
Background on Plant
The plant is owned by Guangdong Holdings Limited.[1] [2]The plant's first two units totaling 110 MW, commissioned in 1990, were planned for retirement after units 3-4 were put online, with a total planned capacity of 600 MW. It is a CHP power plant, supplying heat and steam to surrounding enterprises.[3]
The new units were completed in February 2016, and units 1-2 were retired.[4]
Plant Details for Units 1 & 2
- Sponsor: Guangdong Zhongshan power Gen Co.
- Parent company: Guangdong Holdings Limited
- Location: Huangpu Town, Zhongshan Prefecture, Guangdong Province, China
- Coordinates: 22.696143, 113.320048 (exact)
- Status: Retired (2016)
- Gross capacity: 110 MW (Unit 1: 50 MW, Unit 2: 60 MW)
- Type: Subcritical
- In service: 1990
- Coal type:
- Coal source:
- Source of financing:
Project Details for Units 3 & 4
- Sponsor: Guangdong Zhongshan power Gen Co.
- Parent company: Guangdong Holdings Limited
- Location: Huangpu Town, Zhongshan Prefecture, Guangdong Province, China
- Coordinates: 22.696143, 113.320048 (exact)
- Status: Operating
- Gross capacity: 600 MW (Units 3 & 4: 300 MW)
- Type: Subcritical
- In service: 2016
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "中山火电扩建项目将带来环境污染?"中山日报, 2014-07-25
- ↑ "中山火电实现“超洁净排放”"中山日报, 2016-02-06
- ↑ "中山火力发电有限公司2×300MW“上大压小"热电联产扩建工程建设监理," China International Bidding Website, 5-15-2013
- ↑ "真正实现“上大压小” 中山火电热电联产扩建工程通过168小时满负荷试运行," 中山火电, 2016/2/4