The map below shows the location of the Essar refinery in Vadinar, Jamnagar, Gujarat, India, where the Salaya project is under construction. | The map below shows the location of the Essar refinery in Vadinar, Jamnagar, Gujarat, India, where the Salaya project is under construction. | ||
− | {{#display_map: | + | {{#display_map:22.32912, 69.74739|width=500|height=400|type=hybrid|zoom=14}} |
==Fuel supply== | ==Fuel supply== | ||
Line 40: | Line 40: | ||
{{#display_points: | {{#display_points: | ||
− | + | center=22,82.43 | |
|width=400 | |width=400 | ||
|height=350 | |height=350 | ||
Line 58: | Line 58: | ||
13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.; | 13.09,80.27~Proposed coal plants in Tamil Nadu~Click '''[[:Category:Proposed coal plants in Tamil Nadu|here]]''' for more information.; | ||
26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.; | 26.85,80.91~Proposed coal plants in Uttar Pradesh~Click '''[[:Category:Proposed coal plants in Uttar Pradesh|here]]''' for more information.; | ||
− | 22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information. | + | 22.57,88.27~Proposed coal plants in West Bengal~Click '''[[:Category:Proposed coal plants in West Bengal|here]]''' for more information. |
|zoom=4 | |zoom=4 | ||
}} | }} |
Revision as of 23:25, 24 August 2012
{{#Badges:CoalSwarm|navbar-Indiacoal}}
This article is a stub. You can help by expanding it. |
The Salaya power plant is a proposed 3120 megawatt (MW) power station proposed by Essar Power Gujarat, a subsidiary of Essar Energy. The company has proposed to build the plant in three stages - the coal-fired Salaya I (1200 MW) and Salaya II power plants (1320 MW) and the petroleum coke-fired Salaya III plant (600 MW). The plant is proposed to be built near the company's oil refinery complex at Vadinar, Jamnagar district, Gujarat, India.[1]
Contents
Location
The map below shows the location of the Essar refinery in Vadinar, Jamnagar, Gujarat, India, where the Salaya project is under construction.
Fuel supply
The company states that coal for stages I will be based on imported coal from the company's "captive coal mine in Indonesia." Stage II will be based on imported coal that has yet to be secured. Stage III will use pet coke from the Vadinar refinery after the completion of the Phase I Refinery Project and coal from an unspecified source.[1]
The company intends that coal for the power station be imported through the proposed Salaya port, which it stated in its April 2010 Prospectus was being "developed by Essar Bulk Terminal, an Essar Affiliated Company."[2]
The company states that it has entered into a 25-year contract from 15 September 2010 with Essar Shipping and Logistics for the carriage of "3.6 to 4.4 mmt of coal per year in bulk from Richards Bay in South Africa, or Tanjung Bara in Indonesia, to the Salaya port in India."[3]
Power Purchase agreement
In its 2010 Prospectus Essar Energy states that on 26 February 2007, it "entered into a 25-year PPA with GUVNL for the sale of 1,000 MW per year of power, with power supply from the first and second units commencing in February 2011 and August 2011, respectively."[3]
Financing
In its April 2010 Prospectus Essar Energy stated that "in September 2008 Essar Power Gujarat entered into a rupee denominated loan facility agreement with the State Bank of India and certain other lenders for Rs. 25.525 billion (US$546.80 million). In addition, in May 2009 Essar Power Gujarat entered into a rupee denominated loan facility agreement with ICICI Bank Limited for Rs. 10.250 billion (US$219.58 million) and with Essar Power for Rs. 375 million (US$8 million)."[2]
Project Details
Sponsor: Essar Energy
Location: Vadinar, Jamnagar district, Gujarat, India
Coordinates: 22.32912, 69.74739 (approximate area)
Status: Stage I: Under construction; Stage II: Under construction, Stage III: Under construction[1]
Nameplate capacity: Stage 1: 1200 MW; Stage 2: 1,320 MW; Stage 3: 600 MW[1]
Type: Stage I: Subcritical; Stage II: Supercritical; Stage III: Circulating fluidized bed[1]
Projected in service:
Coal Type:
Coal Source: Stage I - coal from the company's captive mine in Indonesia; Stage II - imported coal that has yet to be secured; Stage III will use pet coke from the Vadinar refinery after the completion of the Phase I Refinery Project and coal from an unspecified source.[1]
Estimated annual CO2: 14,192,882 tons from the coal-fired plant only
Source of financing: State Bank of India, ICIC Bank and others
Resources and articles
Related SourceWatch articles
References
- ↑ Jump up to: 1.0 1.1 1.2 1.3 1.4 1.5 Essar Energy, "Power,", Essar Energy website, accessed March 2012.
- ↑ Jump up to: 2.0 2.1 Essar Energy, "Prospectus", April 2010, page 98. (Large pdf)