Difference between revisions of "Kolubara B Power Station"
Line 15: | Line 15: | ||
==Project Details== | ==Project Details== | ||
− | *'''Sponsor:''' . | + | *'''Sponsor:''' EPS, Edison. |
− | *'''Parent company:''' | + | *'''Parent company:''' Edison: EDF (50%), A2A (50%) |
*'''Developer:''' | *'''Developer:''' | ||
− | *'''Location:''' | + | *'''Location:''' Veliki Crljeni, Belgrade |
*'''Coordinates:''' 44.4675,20.28444 (approximate) | *'''Coordinates:''' 44.4675,20.28444 (approximate) | ||
− | *'''Status:''' | + | *'''Status:''' Permitted |
*'''Capacity:''' 750 MW | *'''Capacity:''' 750 MW | ||
*'''Type:''' | *'''Type:''' | ||
− | *'''Start date:''' | + | *'''Start date:''' 2019 |
− | *'''Coal Type:''' | + | *'''Coal Type:''' Ignite |
− | *'''Coal Source:''' | + | *'''Coal Source:''' Kolubara mine |
− | *'''Source of financing:''' | + | *'''Source of financing:''' EBRD |
==Articles and Resources== | ==Articles and Resources== |
Revision as of 02:12, 2 May 2014
{{#badges: CoalSwarm|Template:Navbar-Serbiacoal}} The Kolubara B power station is a proposed 750 megawatt coal-fired station comprising two 325 MW generating units.
Contents
Location
Proposed location of Kolubara B Power Station - approximate area only
Background
On June 30, 2011, Serbia's state-run power utility Elektroprivreda Srbije (EPS) and Italy's Edison signed a preliminary deal to jointly develop the two coal-fired units. A feasibility study is expected to be completed in the first quarter of 2012. After that the two utilities will set up a joint venture. They gave no estimation of the cost.[1][2] [3]
Under the proposal, Edison offered EPS a 36.4 percent stake in the new company, in which EPS had already invested 300 million euros ($424.8 million) back in 1988 until putting the construction on hold due to lack of funds. EPS had earlier put the construction cost of the plant at around 1.6 billion euros ($2.3 billion). No bidder has expressed interest in building the plant.[1]
Financing
On Sep. 6, 2013, the European Bank for Reconstruction and Development (EBRD) confirmed that it is no longer interested in financing the plant, saying in an email that "We have also informed [Elektroprivreda Srbije] that, should the project become active again, it will have to be assessed against the [Bank's] new energy strategy which has far more stringent rules and would make our possible participation very difficult.” EBRD is under pressure to follow the example of the World Bank and the European Investment Bank in significantly limiting coal lending.[4]
Project Details
- Sponsor: EPS, Edison.
- Parent company: Edison: EDF (50%), A2A (50%)
- Developer:
- Location: Veliki Crljeni, Belgrade
- Coordinates: 44.4675,20.28444 (approximate)
- Status: Permitted
- Capacity: 750 MW
- Type:
- Start date: 2019
- Coal Type: Ignite
- Coal Source: Kolubara mine
- Source of financing: EBRD
Articles and Resources
Sources
- ↑ Jump up to: 1.0 1.1 "Serbia EPS, Italy Edison in 750 MW coal-fired project", Reuters, June 30, 2011.
- ↑ Misha Savic, "Edison Agrees With Serbian EPS to Complete Kolubara B Plant", Bloomberg, June 30, 2011.
- ↑ Misha Savic, "Edison Agrees With Serbian EPS to Complete Kolubara B Plant", Bloomberg, June 30, 2011.
- ↑ "EBRD gives up Kolubara B lignite power plant project in Serbia," CEE Bankwatch and CEKOR Press Release, Sep. 9, 2013.
Related SourceWatch articles
Europe and coal
- Austria and coal
- Belgium and coal
- Bulgaria and coal
- France and coal
- Germany and coal
- Greece and coal
- Hungary and coal
- Italy and coal
- Kosovo and coal
- Netherlands and coal
- Norway and coal
- Poland and coal
- Serbia and coal
- United Kingdom and coal
- World Bank and coal