'''Permits:''' [http://bit.ly/1kor8o5 Environmental Clearance] (October 28, 2009); [http://bit.ly/1g4zVrb Environmental Clearance] (December 27, 2010)
+
'''Permits:''' [http://bit.ly/1kor8o5 Environmental Clearance for two 300 MW units] (October 28, 2009); [http://bit.ly/1g4zVrb Environmental Clearance for two 600 MW units] (December 27, 2010)
  
 
==Articles and resources==
 
==Articles and resources==

Revision as of 16:01, 7 August 2014

{{#badges: CoalSwarm|Navbar-Indiacoal}} Pegadapalli (Jaipur Mandal) power station (also known as the Adilabad power station or the Jaipur power station) is a 1200-megawatt (MW) coal-fired power plant that is being built by Singareni Collieries in Andhra Pradesh, India.

Project Location

The map below shows the construction site as identified in Wikimapia, near the city of Ramagundam.[1] The location is about 30 km north of the location described in the 2009 Environmental Clearance.[2]

Background

The project was originally permitted as a 600 MW (2 x 300 MW) power station, according to the first Environmental Clearance issued October 28, 2009. [2] In December 2010 a new Environmental Clearance was issued for a 1200 MW (2 x 600 MW) project.[3] The project is under construction.[4]

In April 2011, it was reported that India's second largest coal mining company, Singareni Collieries (SCCL), had achieved financial closure for its $1.4-billion station in Adilabad district, Andhra Pradesh. It is expected to be operational in April 2014. Of the 1200 MW, 150 MW would be earmarked for SCCL's use and the remaining 1050 MW would be sold to AP Transco.[5]

Project Details

Sponsor: Singareni Collieries
Location: Pegadapalli village, Jaipur Mandal, Adilabad district, Andhra Pradesh, India
Coordinates: 18.8270561, 79.5702839 (exact)[1]
Status: Unit 1: Construction; Unit 2: Construction
Nameplate capacity: Unit 1: 600 MW; Unit 2: 600 MW
Type:
Projected in service: 2014
Coal Type:
Coal Source: Srirampur Coalfields of SCCL[6]
Estimated annual CO2:
Source of financing: Power Finance Corporation
Permits: Environmental Clearance for two 300 MW units (October 28, 2009); Environmental Clearance for two 600 MW units (December 27, 2010)

Articles and resources

References

  1. Jump up to: 1.0 1.1 SINGARENI THERMAL POWER PLANT, Wikimapia, accessed February 2014
  2. Jump up to: 2.0 2.1 "J -13012/88/2008 -IA.II(T)," Environmental Clearance, Ministry of Environment and Forests, October 28, 2009
  3. "J-13012/88/2008-IA.II (T)," Environmental Clearance, Ministry of Environment and Forests, December 27, 2010
  4. "World Electric Power Plants Database,", Platts, September 2013. The database is not available online but can be purchased from Platts.
  5. "SSCL achieves financial closure for Adilabad power plant" IBN Live, April 1, 2011.
  6. "Singareni Collieries Co to set up 600 MW thermal power plant at Jaipur Village," Thermal Power, accessed January 2012