==Background on Project==
The power station consist of two phases. The first Phase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.<ref>[http://www.xbjg.com/cn/news_view.asp?id=184 "兵团建工集团签定华威和田热电厂工程总承包协议,"] 本站原创, 2012-2-1</ref>
Phase II is a coal-fired power plant with a total planned capacity two units of 600 300 MWeach.<ref>[http://bit.ly/1pnFKlb "华威和田发电有限公司二期2×30万千瓦热电联产项目"], 和田地区招商局, 2014-2-26</ref>