Huawei Hetian power station

From SourceWatch
Jump to navigation Jump to search

Huawei Hetian power station (华威和田发电有限公司二期热电联产项目) is a 270-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.

Location

The undated satellite photo below shows the power station in Hotan (Hetian) Prefecture.

Loading map...

Background on Project

The power station consist of two phases. Phase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.[1][2] As of 2014 the two units are under construction.[3]

Unit 1 began operating in April 2015,[4] and unit 2 in November 2015.[5]

Expansion

Phase II would be a coal-fired power plant with two units of 300 MW each. It is seeking permitting.[6]

With no developments since 2014, the project appears to be shelved.

Project Details

  • Sponsor: Beijing Huawei Hetian Investment and Zhongmu Company
  • Parent company:
  • Location: Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China
  • Coordinates: 37.167593, 79.905582 (exact)
  • Status: Operating (Units 1-2), Cancelled (Units 3-4)
  • Gross capacity: 870 MW (Units 1-2: 135 MW; Units 3-4: 300 MW)
  • Type:
  • Projected in service: 2015 (Units 1-2)
  • Coal type:
  • Coal source:
  • Source of financing: