Difference between revisions of "Huawei Hetian power station"

From SourceWatch
Jump to navigation Jump to search
Line 2: Line 2:
  
 
==Location==  
 
==Location==  
The map below shows the location of Hotan (Hetian) Prefecture, the approximate location where the plant would be built in Xinjiang Uyghur Autonomous Region.  
+
The undated satellite photo below shows the power station in Hotan (Hetian) Prefecture.  
{{#display_point:37.113, 79.922|width=600|height=500|type=normal|zoom=7}}
+
{{#display_point:37.167593, 79.905582|width=600|height=500|type=hybrid|zoom=16}}
 
 
  
 
==Background on Project==
 
==Background on Project==
Line 15: Line 14:
 
*'''Parent company:'''  
 
*'''Parent company:'''  
 
*'''Location:''' Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China<ref>[http://bit.ly/1mucCOA "兵团建工集团签定华威和田热电厂工程总承包协议"], 新疆兵团建设工程集团, 2012-2-1</ref>
 
*'''Location:''' Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China<ref>[http://bit.ly/1mucCOA "兵团建工集团签定华威和田热电厂工程总承包协议"], 新疆兵团建设工程集团, 2012-2-1</ref>
*'''Coordinates:''' 37.113, 79.922 (approximate)
+
*'''Coordinates:''' 37.167593, 79.905582 (exact)
*'''Status:''' Units 1 and 2: Construction; Units 3 and 4: Announced
+
*'''Status:''' Operating (Unit 1), Construction (Unit 2), Announced (Units 3 and 4)
 
*'''Gross capacity:''' 870 MW (Units 1 and 2: 135 MW; Units 3 and 4: 300 MW)
 
*'''Gross capacity:''' 870 MW (Units 1 and 2: 135 MW; Units 3 and 4: 300 MW)
 
*'''Type:'''  
 
*'''Type:'''  
*'''Projected in service:''' 2014 (Units 1 and 2)
+
*'''Projected in service:''' 2015 (Units 1 and 2)
 
*'''Coal type:'''  
 
*'''Coal type:'''  
 
*'''Coal source:'''  
 
*'''Coal source:'''  

Revision as of 17:52, 5 November 2015

{{#badges:CoalSwarm|Navbar-Chinacoal}}Huawei Hetian power station (华威和田发电有限公司二期热电联产项目) is a proposed 870-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.

Location

The undated satellite photo below shows the power station in Hotan (Hetian) Prefecture.

Background on Project

The power station consist of two phases. Phase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.[1] As of 2014 the two units are under construction.[2]

Phase II is a coal-fired power plant with two units of 300 MW each.[3]

Project Details

  • Sponsor: Beijing Huawei Hetian Investment and Zhongmu Company
  • Parent company:
  • Location: Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China[4]
  • Coordinates: 37.167593, 79.905582 (exact)
  • Status: Operating (Unit 1), Construction (Unit 2), Announced (Units 3 and 4)
  • Gross capacity: 870 MW (Units 1 and 2: 135 MW; Units 3 and 4: 300 MW)
  • Type:
  • Projected in service: 2015 (Units 1 and 2)
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and resources

References

Related SourceWatch articles

External resources