Difference between revisions of "Huawei Hetian power station"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
==Background on Project== | ==Background on Project== | ||
− | The power station consist of two phases. Phase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.<ref>[http://www.xbjg.com/cn/news_view.asp?id=184 "兵团建工集团签定华威和田热电厂工程总承包协议,"] 本站原创, 2012-2-1</ref> As of 2014 the two units are under construction.<ref>[http://www.xjslt.gov.cn/stbcc/jdgl/2014/28792.htm "华威和田热电厂2*135WM工程水土保持督查意见,"] 打印, 2014-08-06</ref> | + | The power station consist of two phases. Phase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.<ref>[http://www.xbjg.com/cn/news_view.asp?id=184 "兵团建工集团签定华威和田热电厂工程总承包协议,"] 本站原创, 2012-2-1</ref><ref>[http://bit.ly/1mucCOA "兵团建工集团签定华威和田热电厂工程总承包协议"], 新疆兵团建设工程集团, 2012-2-1</ref> As of 2014 the two units are under construction.<ref>[http://www.xjslt.gov.cn/stbcc/jdgl/2014/28792.htm "华威和田热电厂2*135WM工程水土保持督查意见,"] 打印, 2014-08-06</ref> |
+ | |||
+ | Unit 1 began operating in 2015.<ref>[http://www.xjht.gov.cn/Article/ShowArticle.aspx?ArticleID=219840 "华威和田热电厂一号机组投产闫国灿艾则孜•木沙出席投产仪式,"] 和田日报 发表时间, 2015-4-20</ref> | ||
Phase II is a coal-fired power plant with two units of 300 MW each.<ref>[http://bit.ly/1pnFKlb "华威和田发电有限公司二期2×30万千瓦热电联产项目"], 和田地区招商局, 2014-2-26</ref> | Phase II is a coal-fired power plant with two units of 300 MW each.<ref>[http://bit.ly/1pnFKlb "华威和田发电有限公司二期2×30万千瓦热电联产项目"], 和田地区招商局, 2014-2-26</ref> | ||
Line 13: | Line 15: | ||
*'''Sponsor:''' [[Beijing Huawei Hetian Investment]] and [[Zhongmu Company]] | *'''Sponsor:''' [[Beijing Huawei Hetian Investment]] and [[Zhongmu Company]] | ||
*'''Parent company:''' | *'''Parent company:''' | ||
− | *'''Location:''' Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China | + | *'''Location:''' Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China |
*'''Coordinates:''' 37.167593, 79.905582 (exact) | *'''Coordinates:''' 37.167593, 79.905582 (exact) | ||
*'''Status:''' Operating (Unit 1), Construction (Unit 2), Announced (Units 3 and 4) | *'''Status:''' Operating (Unit 1), Construction (Unit 2), Announced (Units 3 and 4) | ||
*'''Gross capacity:''' 870 MW (Units 1 and 2: 135 MW; Units 3 and 4: 300 MW) | *'''Gross capacity:''' 870 MW (Units 1 and 2: 135 MW; Units 3 and 4: 300 MW) | ||
*'''Type:''' | *'''Type:''' | ||
− | *'''Projected in service:''' 2015 ( | + | *'''Projected in service:''' 2015 (Unit 1) |
*'''Coal type:''' | *'''Coal type:''' | ||
*'''Coal source:''' | *'''Coal source:''' |
Revision as of 17:54, 5 November 2015
{{#badges:CoalSwarm|Navbar-Chinacoal}}Huawei Hetian power station (华威和田发电有限公司二期热电联产项目) is a proposed 870-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.
Contents
Location
The undated satellite photo below shows the power station in Hotan (Hetian) Prefecture.
Background on Project
The power station consist of two phases. Phase I is a 2 x 135 MW power station in in Xinjiang Uyghur Autonomous Region.[1][2] As of 2014 the two units are under construction.[3]
Unit 1 began operating in 2015.[4]
Phase II is a coal-fired power plant with two units of 300 MW each.[5]
Project Details
- Sponsor: Beijing Huawei Hetian Investment and Zhongmu Company
- Parent company:
- Location: Hotan (Hetian) Prefecture, Xinjiang Uyghur Autonomous Region, China
- Coordinates: 37.167593, 79.905582 (exact)
- Status: Operating (Unit 1), Construction (Unit 2), Announced (Units 3 and 4)
- Gross capacity: 870 MW (Units 1 and 2: 135 MW; Units 3 and 4: 300 MW)
- Type:
- Projected in service: 2015 (Unit 1)
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "兵团建工集团签定华威和田热电厂工程总承包协议," 本站原创, 2012-2-1
- ↑ "兵团建工集团签定华威和田热电厂工程总承包协议", 新疆兵团建设工程集团, 2012-2-1
- ↑ "华威和田热电厂2*135WM工程水土保持督查意见," 打印, 2014-08-06
- ↑ "华威和田热电厂一号机组投产闫国灿艾则孜•木沙出席投产仪式," 和田日报 发表时间, 2015-4-20
- ↑ "华威和田发电有限公司二期2×30万千瓦热电联产项目", 和田地区招商局, 2014-2-26