{{#Badges:CoalSwarm|navbar-Indiacoal}} '''Ghugus power station''' is a proposed coal plant of Maharashtra, India.
+
{{#Badges:CoalSwarm|navbar-Indiacoal}} '''Ghugus power station''' is a 120-megawatt (MW) coal plant in Maharashtra state, India. An additional 540 MW has been proposed.
  
 
==Location==
 
==Location==
The map below shows the location of Ghugus, but not the exact location of the project:
+
The map below shows the power station in Usegaon village.
{{#display_point:|Ghugus, Maharashtra|width=500|height=400|type=normal|zoom=8}}
+
{{#display_point:19.9294895, 79.1331589|width=600|height=500|type=hybrid|zoom=17}}
  
 
==Background==
 
==Background==
Phase I of '''Ghugus power station'''  is a 120 megawatt (MW) coal plant under execution in Maharashtra state, India. Phase II of 540 MW is also envisiged by the company at the same location. According to the company, "all the financial and administrative sanctions for the success of the project are in place."<ref>[http://www.guptacoal.com/power.php "Gupta Power"], Gupta Coal website, accessed February 2012.</ref>
+
Ghugus power station consists of two 60 MW units. Unit 1 went into operation in May 2012; Unit 2 went into operation in September 2012.<ref name=Gupta>[http://bit.ly/1iCgxUK "GUPTA ENERGY,"] company website accessed April 2014.</ref>
 +
 
 +
==Phase II: 540 MW==
 +
According to the company website, a phase II of 540 MW (2 x 270 MW) is under development by the company at the same location. In 2014 the company described the status of the project as follows:<ref name=Gupta/>
 +
:Phase II (2 x 270 MW) is having necessary infrastructure such as land, water, power evacuation facility, logistics etc. The clearances from Ministry of Power & Industries, Civil Aviation Dept. Water Irrigation Dept. & all other local bodies. The Company has all the financial and administrative sanctions for the success of the project. The project is being executed by the company on its own following individual package route under the able guidance of its technical team and the project consultants.
 +
 
 +
Phase II received a terms of reference in 2010,<ref>[http://bit.ly/1jQt4SE Terms of Reference,] India MoEF, February 11, 2010</ref> but as of April 2015 has yet to secure environmental clearance, and appears to be abandoned.
  
 
==Project Details==
 
==Project Details==
 
'''Sponsor:''' [[Gupta Coalfields & Washeries]]<br>
 
'''Sponsor:''' [[Gupta Coalfields & Washeries]]<br>
'''Location:'''  Usegaon village near Ghugus in Chandrapur district, Maharashtra state, India<br>
+
'''Location:'''  Usegaon village, near Ghugus in Chandrapur district, Maharashtra<br>
'''Coordinates:''' <br>
+
'''Coordinates:''' 19.9294895, 79.1331589 (exact)<br>
'''Status:''' Phase I: Advanced development; Phase II: Proposed<br>
+
'''Status:'''  
'''Nameplate capacity:''' Phase I: 120 MW (2 x 60 MW); Phase II: 540 MW (2 x 270 MW)<br>
+
* Phase I: Operating (2012)
'''Type:''' <br>
+
* Phase II: Cancelled
'''Projected in service:''' <br>
+
'''Capacity:'''  
 +
*Phase I: 120 MW (2 x 60 MW)
 +
*Phase II: 540 MW (2 x 270 MW)
 +
'''Type:''' Subcritical<br>
 +
'''Projected in service:'''  
 
'''Coal Source:''' <br>
 
'''Coal Source:''' <br>
 
'''Estimated annual CO<sub>2</sub>:''' <br>
 
'''Estimated annual CO<sub>2</sub>:''' <br>
'''Source of financing:''' <br>  
+
'''Source of financing:''' <br>
 +
'''Permits and applications:'''
 +
* Phase I: [http://bit.ly/1r6SMqy Environmental Clearance,] India MoEF, September 4, 2008
 +
* Phase II: [http://bit.ly/1jQt4SE Terms of Reference,] India MoEF, February 11, 2010
  
 
==Resources and articles==
 
==Resources and articles==
Line 53: Line 66:
 
}}
 
}}
  
[[category:india]] [[category:mining]][[Category: Proposed coal plants in Maharashtra]][[Category: India and coal]][[Category: Proposed coal plants in India]]
+
[[category:india]] [[category:mining]][[Category: Proposed coal plants in Maharashtra]][[Category: India and coal]][[Category: Proposed coal plants in India]][[Category: Existing coal plants in India]][[Category: Existing coal plants in Asia]][[Category: Proposed coal plants in Asia]][[Category: Existing coal plants in Maharashtra]]

Latest revision as of 22:19, 11 April 2015

{{#Badges:CoalSwarm|navbar-Indiacoal}} Ghugus power station is a 120-megawatt (MW) coal plant in Maharashtra state, India. An additional 540 MW has been proposed.

Location

The map below shows the power station in Usegaon village.

Background

Ghugus power station consists of two 60 MW units. Unit 1 went into operation in May 2012; Unit 2 went into operation in September 2012.[1]

Phase II: 540 MW

According to the company website, a phase II of 540 MW (2 x 270 MW) is under development by the company at the same location. In 2014 the company described the status of the project as follows:[1]

Phase II (2 x 270 MW) is having necessary infrastructure such as land, water, power evacuation facility, logistics etc. The clearances from Ministry of Power & Industries, Civil Aviation Dept. Water Irrigation Dept. & all other local bodies. The Company has all the financial and administrative sanctions for the success of the project. The project is being executed by the company on its own following individual package route under the able guidance of its technical team and the project consultants.

Phase II received a terms of reference in 2010,[2] but as of April 2015 has yet to secure environmental clearance, and appears to be abandoned.

Project Details

Sponsor: Gupta Coalfields & Washeries
Location: Usegaon village, near Ghugus in Chandrapur district, Maharashtra
Coordinates: 19.9294895, 79.1331589 (exact)
Status:

  • Phase I: Operating (2012)
  • Phase II: Cancelled

Capacity:

  • Phase I: 120 MW (2 x 60 MW)
  • Phase II: 540 MW (2 x 270 MW)

Type: Subcritical
Projected in service: Coal Source:
Estimated annual CO2:
Source of financing:
Permits and applications:

Resources and articles

Related SourceWatch articles


References

  1. Jump up to: 1.0 1.1 "GUPTA ENERGY," company website accessed April 2014.
  2. Terms of Reference, India MoEF, February 11, 2010

External Articles