Difference between revisions of "Boffa Alumina power station"

From SourceWatch
Jump to navigation Jump to search
Line 15: Line 15:
 
*'''Location:''' Boffa Prefecture, Guinea
 
*'''Location:''' Boffa Prefecture, Guinea
 
*'''Coordinates:''' 10.184167, -14.043889 (location of Boffa Prefecture)
 
*'''Coordinates:''' 10.184167, -14.043889 (location of Boffa Prefecture)
*'''Status:''' Proposed
+
*'''Status:''' Permitted
*'''Gross Capacity:''' 340 MW
+
*'''Gross Capacity:''' 250 MW
 
*'''Type:''' [[Subcritical]]
 
*'''Type:''' [[Subcritical]]
 
*'''Start date:''' 2020
 
*'''Start date:''' 2020

Revision as of 16:45, 2 August 2014

{{#badges:CoalSwarm}} The Boffa Alumina power station is a proposed 250-megawatt (MW) coal-fired power station in Boffa Prefecture, Guinea.

Location

The map below shows the location of Boffa Prefecture, Guinea, but not the exact location of the Boffa Alumina power station.

Background

In September 2011 Guinea officials asked China Power Investment (CPI) to build a 340 MW coal-fired power plant in the country. It was reported that the "project is part of ongoing negotiations between Guinea and CPI over the potential development of a bauxite mine in Boffa and construction of an alumina refinery and deepwater port."[1]

In 2013 CPI Group signed a project concession agreement with the Government of Guinea to build an industrial park in CPI Guinea Boffa region. The park will include an aluminum plant and at least 250 MW of installed coal capacity. There will also be a deep-water port and an associated aluminum mine at the Sanger Reddy district. Construction is planned to begin in 2014 and end in 2020.[2]

Project Details

  • Sponsor: CPI Boffa Alumina
  • Parent company: China Power Investment
  • Location: Boffa Prefecture, Guinea
  • Coordinates: 10.184167, -14.043889 (location of Boffa Prefecture)
  • Status: Permitted
  • Gross Capacity: 250 MW
  • Type: Subcritical
  • Start date: 2020
  • Coal Type:
  • Coal Source:
  • Source of financing:

Articles and resources

References

  1. "Guinea asks China to build 340 MW power plant" Saliou Samb, Reuters, September 18, 2011.
  2. "CPI to spend $ 6 billion investment to build aluminum base in Guinea," Stock Market Today blog, Sep 9, 2013.

Related SourceWatch articles

External resources

External articles

This article is a stub. You can help by expanding it.