{{#badges:CoalSwarm|Navbar-Turkeycoal}}Çankırı Orta power station is a proposed 150-megawatt (MW) coal-fired power plant in Çankırı province, Turkey.

It is a separate proposal from the 150 MW Çankırı Orta Bereket power station.

Location

The map below shows the location of Orta district, the approximate location where the plant would be built in Çankırı province.

Loading map...

Background on Plant

In December 2005, Çalık Enerji received permits to build a 150-MW mine-to-mouth coal-fired power plant in the Orta district of Çankırı province (with coal from Bereket A.Ş., which was planning on developing a lignite coal mine in the area). In September 2006, Çalık contracted Pöyry to work on the plant's construction. At the time, the plant's completion was scheduled for October 2009.[1][2][3] However, while Çalık Holding's 2008 Annual Report mentions that planning for the project was ongoing, and while a 2008 news report mentions the project, beginning in 2009 there is no mention of the project in the company's annual reports.[4] The plant would apparently be mine-to-mouth, with Çalık also mining lignite coal for the plant.

As of April 2018, although EMRA shows the preliminary licence (granted August 2015) with an end date of 09.07.2018 its status is shown as "Sonlandırıldı" (meaning "ended");[5] but the Çalık website still shows that it plans to start constructing the plant in 2018.[6]

As of June 2019 the project has been removed from the EMRA website and appears to be cancelled.

Project Details

  • Sponsor: Çalık Enerji
  • Parent company: Çalık Grubu
  • Location: Orta district, Çankırı province, Turkey
  • Coordinates: 40.626, 33.11 (approximate)
  • Status: Cancelled
  • Detailed status:
  • Gross capacity: 150 MW
  • Type: Circulating fluidized bed[7]
  • Projected in service:
  • Coal type: Lignite
  • Coal source: Çankırı Orta coal mine, Turkey
  • Source of financing:

Articles and resources

References

  1. Çalık Holding 2007 Annual Report, p. 49.
  2. Çalık'tan termik santral, Internet Haber, Feb. 6, 2008.
  3. Pöyry Awarded Consultancy Contract for Thermal Power Plant in Turkey, Pöyry press release, Sept. 13, 2006.
  4. Çalık Holding 2008 Annual Report, p. 40.
  5. EMRA, prelicense ÖN/5677-4/03313
  6. "Çankırı-Orta Thermal Power Plant and Mine Site Project", company website, accessed April 2018.
  7. Çalık`tan Çankırı`ya kömür santrali, Enerji Günlügü, 18 Aug. 2015.

Related SourceWatch articles