Adaro East Kalimantan power station is a proposed 600-megawatt (MW) mine-mouth coal-fired power plant in East Kalimantan Province, Indonesia.

Location

The map below shows the location of East Kalimantan Province, the approximate location where the plant would be built.

Loading map...


Background on Project

In November 2014, Adaro Indonesia and Shenhua Group signed an agreement to build a two-unit, 600-MW mine-mouth coal-fired power plant in East Kalimantan Province.[1][2] The project's developers plan to bring the plant online in 2019.[3] According to a September 2015 presentation by Adaro Energy, the project will use low heat value coal. Pre-feasibility and feasibility studies will begin soon on the power project and the related coal mine. The project will use non-recourse project debt financing.[4] As of November 2016, it is reported that the project continues in the feasibility study stage.[5]

As of November 2019 there had been no further news about this project and it appears to be cancelled.

Project Details

  • Sponsor: Bhakti Energy and China Shenhua Overseas Development and Investment
  • Parent company: Adaro Indonesia (49%) and Shenhua Group (51%)
  • Location: East Kalimantan Province, Indonesia
  • Coordinates: 0.1, 116.4 (approximate)
  • Status: Cancelled
  • Gross capacity: 600 MW (Units 1 & 2: 300 MW)
  • Type:
  • Projected in service:
  • Coal type:
  • Coal source: Mine-mouth
  • Source of financing: