Agentala Mine of Shaogen Coalfield

From SourceWatch
Jump to navigation Jump to search

Agentala Mine of Shaogen Coalfield (内蒙古阿鲁科尔沁旗绍根煤田阿根塔拉矿井) is located in Shaogen Town of Ar Horqin Banner, Inner Mongolia, China. The production capacity is designed to 1.8 Million tonnes(Mt)/year.

Location

The undated satellite photo below shows the coal mine located in Shaogen Town, Ar Horqin Banner, Inner Mongolia, China.

Loading map...

Coal Mine Background

After more than four years with no news reports on the project, the Agentala Coal Mine appears to be abandoned.

Project Details

  • Sponsor: Inner Mongolia Zhongying Tianshan Energy Development Co.
  • Parent Company: Zhongying Group (49%), Beijing Weirun International Energy Investment Co.(41%), Inner Mongolia Pingzhuang Coal (10%)
  • Location: Liulin Town, Juye County, Heze, Shandong Province, China
  • GPS Coordinates: 43.648574,120.805416 (approximate)
  • Status: Construction
  • Production Capacity: 1.8Mt/year
  • Total Resource:
  • Minable Reserves:
  • Coal Type: Anthracite[1]
  • Mine Size: 19.1545k㎡[2]
  • Mine Type: Underground
  • Start Year:
  • Source of Financing:


Articles and resources

References

  1. "内蒙古绍根煤田将建设一煤转化综合项目"中国电力企业联合会,2010/11/27
  2. "内蒙古煤矿采矿权信息"page 89,内蒙古自治区自然资源厅,2015/07

Related SourceWatch articles