Anhui Banji Coal Mine
Jump to navigation
Jump to search
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Anhui Banji Coal Mine (中煤新集能源股份有限公司板集煤矿) is located within Lixin County of Anhui Province, China. The annual production capacity of it is 3 million tonnes(Mt) per year.
Contents
Location
The undated satellite photo below shows the coal mine located in Huji Town, Lixin County, Bozhou, Anhui, China
Loading map...
Coal Mine Background
The construction of Banji Coal Mine started in 2006, however, it was suspended in 2015 due to the national capacity reduction policy.[1] The reconstruction proposal of Banji Mine was not approved until February 2018 by the Bozhou Provincial Government.[2]
Project Details
- Sponsor: China Coal Xinji Energy Co.
- Parent Company: China Coal (30.31%), National Energy Investment Group (5.48%), Jingneng Power (1.14%), Beijing Energy (0.65%), Guohua Industry(0.32%), Huainan Industial Development Group (7.18%),China Shipping (4.9%), others(50.02%)
- Location: Huji Town, Lixin County, Bozhou, Anhui, China
- GPS Coordinates: 32.899945,116.228774
- Status: Construction
- Production Capacity: 3 Mt/year
- Total Resource: 506.2Mt[3]
- Minable Reserves: 199.152Mt
- Coal type: Bituminous
- Mine Size: 33.6k㎡[4]
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "省工程咨询研究院组织召开《中煤新集能源股份有限公司板集矿井及选煤厂初步设计(修改)》审查会"安徽省发改委,2018/07/30
- ↑ "中煤新集公司板集煤矿建设工程复工验收获省专家组通过"安徽省亳州市人民政府,2018/08/08
- ↑ "中煤新集能源股份有限公司2017年年度报告摘要 "page8,新浪财经,2018/03/30
- ↑ "中煤新集公司板集煤矿建设工程复工验收获省专家组通过"安徽省亳州市人民政府,2018/08/08