Baiyinhua Industrial Park Captive power station (国家电投内蒙能源白音华工业园自备电厂) is a proposed 700-megawatt (MW) coal-fired power plant in Inner Mongolia Autonomous Region, China.
Contents
Location
The undated satellite photo below shows the location of the project in Baiyinhua Town.
Background on Project
CPI is planning to build a coal-fired power plant with a total planned capacity of 700 MW in Inner Mongolia Autonomous Region.[1][2]
The project was permitted in September 2016,[3] and construction began in October 2016.[4]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In January 2017 China's National Energy Administration issued guidelines recommending the suspension of over 100 planned and under-construction coal power projects in 13 provinces, including Baiyinhua Industrial. The projects are proposed for development after 2020.[5]
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
2018: Construction revived
In May 2018 it was reported that construction had resumed on the power station.[6]
Ownership
In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[7]
Project Details
- Sponsor: SPIC Nei Mongol Power Co, Ltd
- Parent company: State Power Investment Corporation
- Location: Baiyinhua Town, West Ujumqin Banner, Xilingol Prefecture, Inner Mongolia Autonomous Region, China
- Coordinates: 44.7973, 118.5118 (exact)
- Status: Construction
- Gross capacity: 700 MW (Units 1&2: 350 MW)
- Type: Supercritical
- Projected in service:
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "西乌珠穆沁旗白音华工业园区基本情况", 中共锡盟委农村牧区工作部, 2013-04-29
- ↑ "旗委副书记、旗长朝鲁在白音华工业园区检查指导工作," 西乌旗电视台 作者, 2015-08-27
- ↑ "内蒙古自治区发展和改革委员会关于锡林郭勒盟中电投白音华自备电厂新建工程项目核准的批复," Inner Mongolia Development and Reform Commission, Sep 26, 2016
- ↑ "白音华自备电厂新建项目获得核准并开工," Oct 28, 2016
- ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
- ↑ "国家电投白音华高精铝板带项目开工暨白音华自备电厂2x35万千瓦机组建设工程复工仪式," 西乌旗广播电视台, 2018-05-23