Banjarsari power station
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of Indonesia and coal | |
Sub-articles: | |
Related articles: | |
Banjarsari power station is a 220-megawatt (MW) mine-mouth coal-fired power station in South Sumatra Province, Indonesia.
Contents
Location
The map below shows the plant, which is in East Merapi (Merapi Timur) District, Lahat Regency, South Sumatra Province.[1]
Background
The Banjarsari power station is a mine-mouth coal-fired power station in South Sumatra, Indonesia. The size is described by the sponsor as 2 x 110 MW; however, two of the companies involved in building the plant, Black & Veatch and Chinese National Electric Engineering, refer to it as 2 x 135 MW. The plant is being built by PT Bukit Pembangkit Innovative, a joint venture of PT Bukit Asam, PLN, and MAXpower Group. It would be fed by local mines run by PT Bukit Asam (PTBA).[2][3]
Construction is being run by Chinese National Electric Engineering Company (CNEEC), and began in 2012.[2][4] The plant is expected to be completed in April 2015.[5]
According to an April 2015 report, the plant is waiting to connect to the network.[6]
In January 2016, South Sumatra Goveror Alex Noerdin gave the opening speech for the plant, which was described as being already in the commercial stage.[7]
Project Details
- Sponsor: Bukit Pembangkit Innovative (PBI)
- Parent company: PT Bukit Asam, PLN, and MAXpower Group (joint venture)
- Location: East Merapi (Merapi Timur) District, Lahat Regency, South Sumatra Province, Indonesia
- Coordinates: -3.72507, 103.69039 (exact)
- Status: Operating (2015)
- Gross Capacity: 220 MW (2 x 110 MW)[8]
- Type: Subcritical
- In service: 2015
- Coal Type: Low-quality[2]
- Coal Source: Mine-mouth (local PTBA mines)
- Source of financing:
Articles and resources
References
- ↑ PLTU Banjarsari, Wikimapia, accessed Mar. 2015.
- ↑ 2.0 2.1 2.2 Power Plant, Bukit Pembangkit Innovative website, accessed Mar. 2015.
- ↑ "Coal-Fired Plants Financed by International Public Investment Institutions Since 1994", Appendix to Foreclosing the Future: Coal, Climate and International Public Finance: Investment in coal-fired power plants hinders the fight against global warming, Environmental Defense, April 2009.
- ↑ "Successful commencement of Banjarsari Project," China National Electric Engineering Co. Ltd., 22 July 2011
- ↑ PLTU Banjarsari expected to start operating in April, Rambu Energy, 15 Mar. 2015.
- ↑ "PT Bukit Energi Investama, Lini Bisnis PLTU dari Bukit Asam," Investor Daily 16 April 2015, posted on Listrik.org, 17 April 2015
- ↑ "Bright Hope of Sumsel 8," BukiAsam, 06 Jan 2016
- ↑ PTBA juga bikin PLTU dan PLTD di Smelter Haltim milik Antam, Kontan, May 1, 2019