Baoding Northwest Suburb power station

From SourceWatch
Jump to navigation Jump to search

Baoding Northwest Suburb power station (深能保定发电公司) is a 350-megawatt (MW) coal-fired co-generation power station in Hebei Province, China.

Location

The undated satellite photo below shows the plant in Yaozhuang.

Loading map...

Background on Project

Shenzhen Energy has proposed a supercritical coal-fired co-generation power station of 700 MW for Yaozhuang in Mancheng District, Baoding. It is planned to supply heat in winter to Baoding City and be completed in 2017.[1][2]

The plant was permitted in 2015 and is under construction.[3]

Project postponed, then unit 1 revived

2017: Expansion postponed by government

In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[4]

Baoding Northwest Suburb power station Units 1-2 were among the postponed coal-burning units.[5]

September 2017: Suspension lifted on unit 1, continued on unit 2

After political negotiations, China's National Energy Administration (NEA) released an updated list of postponed and halted coal projects on September 26, 2017. The new list contained 151 units totaling 95 gigawatts (GW). Baoding Northwest Suburb power station Unit 1 was no longer on the list, while Unit 2 was, meaning only unit 2 is postponed.[6] For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.

Unit 1 began operating on December 31, 2017.[7]

Construction continues on Unit 2

Satellite photos for September 2017 and March 2018 show construction continuing on Unit 2.

Unit 2 was commissioned in September 2018.[8]

Project Details

  • Sponsor: Shenzhen Energy
  • Parent company: Shenzhen Energy
  • Location: Yaozhuang, Mancheng District, Baoding Prefecture, Hebei Province, China
  • Coordinates: 38.961835, 115.36719 (exact)
  • Status: Operating
  • Gross capacity: 700 MW (Units 1 & 2: 350 MW)
  • Type: Supercritical
  • Start date: 2017 (Unit 1), 2018 (Unit 2)
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and resources

References

Related SourceWatch articles

External resources