Baota power station
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Baota power station (宝塔石化奎山宝塔热电公司热电联产项目) is a proposed 700-megawatt (MW) coal-fired power plant in Xinjiang Autonomous Region, China.
Contents
Location
The map below shows the construction site for the coal plant in Kuishan.
Background on Project
Ningxia Baota Group was planning a 2 x 350 MW power station in Xinjiang Autonomous Region. It started construction in 2011. By 2014, the plant was 60% completed.[1][2][3]
Progress on the power station stopped in 2016 due to lack of investment and dim market prospects. In January 2017, it was reported the plant was sponsored by a consortium led by Doof Holding Group and HNA Group, who said they plan to revive the project. The power plant is a captive one for a petrochemical project.[4]
As of December 2019 there have been no further developments, and the project appears to be shelved.
Project Details
- Sponsor: Doof Holding Group, HNA Group
- Parent company:
- Location: Kuishan, Kuitun, Ili Prefecture, Xinjiang Autonomous Region, China
- Coordinates: 44.362683, 84.965879 (exact)
- Status: Shelved
- Gross capacity: 700 MW (Units 1 & 2: 350 MW)
- Type: Subcritical
- Projected in service:
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "奎山宝塔热电公司和总承包方联署办公," Baota Petrochemical Group, 2012-05-15.
- ↑ "新疆奎山宝塔石化有限公司一期项目全面开工建设," 2013-11-18
- ↑ "新疆奎山宝塔石化一期项目开工建设," Huaxia, 2013-12-13
- ↑ "多重利好叠加 新疆奎山宝塔石化项目潜力加速释放," Xinhua Net, 2017-03-22