Bar power station was a proposed power station of 800 to 870 megawatts (MW) in Montenegro.

Location

The map below shows Bar, the approximate location where the plant would be built.

Loading map...

Background on Plant

In a 2011 presentation by Enel, the company stated it was pursuing an 870MW coal-fired power station in partnership with Duferco. The power station was listed as a greenfield project close to the port of Bar, with a proposed cost of 1,5Bln€. Enel said the feasibility study had been completed.[1] Duferco's website listed the project as a "greenfield 800 MW imported coal power-plant project" between Dufenergy Italia and Enel.[2]

The Bar project was not mentioned in the "Strategic Environmental Assessment for Energy Development Strategy in Montenegro by 2030," released in 2014, and was likely cancelled.

Project Details

  • Sponsor: Dufenergy Italia, Enel
  • Parent company:
  • Developer:
  • Location: Bar, Montenegro
  • Coordinates: 42.1, 19.1 (approximate)
  • Status: Cancelled
  • Capacity: 800 - 870 MW
  • Type:
  • Start date:
  • Coal Type:
  • Coal Source: Imported
  • Source of financing:

Resources and articles

References

  1. Presentation by Francesco Papa, ENEL, "“Ad Hoc Group of Experts on Cleaner Electricity, Production from Coal and Other Fossil Fuels: Balkans - coal projects under monitoring," United Nations - Economic and Social Council, Economic Commission for Europe, Committee on Sustainable Energy, Nov 14-15, 2011.
  2. "Balkans," Duferco website, accessed August 2014.