Battery Rock LNG Terminal
Jump to navigation
Jump to search
This article is part of the FrackSwarm portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. To search by topic or location, click here. |
Categories | |
Related Articles | |
Battery Rock LNG Terminal was a proposed LNG import terminal in Massachusetts, United States.
Contents
Location
Loading map...
Project Details
- Owner:
- Parent: AES
- Location: Outer Brewster Island, Massachusetts, United States
- Coordinates: 42.341781, -70.877681 (approximate)
- Capacity: 6.4 mtpa, 0.92 bcfd
- Status: Cancelled
- Type: Import
- Start Year: Not applicable
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Battery Rock LNG Terminal was a proposed LNG import terminal in Massachusetts, United States.[1] The Associated Press reported in 2007 that AES dropped plans for the Battery Rock terminal after extensive local opposition and competing proposals. [2]
Articles and resources
References
- ↑ Regas Terminal Overview, GIIGNL, February 2014
- ↑ Battery Rock LNG Proposal Shelved, LNG Law Blog, 26 April 2007