Bau-Bau Power Station

From SourceWatch
Jump to navigation Jump to search

Bau-Bau Power Station is a proposed 60-megawatt (MW) coal-fired power plant on Buton Island, Indonesia.

Location

The map below shows Bau-Bau, Buton sland, where the plant would be built.

Loading map...

Background

The project was proposed in the 2017-2026 long-range plan as a 2 x 50 MW plant. Unit 1 was scheduled for completion in 2019/2020 and Unit 2 for completion in 2025/2026.[1] In the 2018-2027 long-range plan, both Units are listed as 30 MW, and the completion date for Unit 1 is changed to 2021/2022.[1] In the 2019-2028 long-range plan the completion date for Unit 1 is changed to 2023/2024 and the completion date for Unit 2 is changed to 2027/2028.[2]

Project Details

  • Sponsor:
  • Parent company: Unit 1: IPP; Unit 2: Unallocated
  • Location: Bau-Bau, Buton Island, Indonesia
  • Coordinates: -5.4594235,122.6059492
  • Gross Capacity: 2 x 30 MW
  • Type:
  • Projected in service: Unit 1: 2023/2024; Unit 2: 2027/2028
  • Coal Type:
  • Coal Source:
  • Source of financing:

Articles and resources

References

Related SourceWatch articles

External resources