Bole Cogen power station
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Bole Cogen power station (湖北能源新疆楚星能源博乐五星热电联产项目) is a 300-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.
Contents
Location
The photo below shows the location of the plant in Bole City, Börtala Mongol Autonomous Prefecture, Xinjiang Uyghur Autonomous Region.
Background on Project
Hubei Energy Group is planning to build a two-unit coal-fired power plant with a total planned capacity of 300 MW in Xinjiang Uyghur Autonomous Region.[1][2][3]
The power station is under construction, and planned for operation in August 2016.[4][5]
Unit 1 began operating in 2016, and unit 2 in 2017.[6]
Project Details
- Sponsor: Xinjiang Chuxing Energy Co.
- Parent company: Hubei Energy Group
- Location: Bole (Börtala) City, Börtala Mongol Autonomous Prefecture, Xinjiang Uyghur Autonomous Region, China
- Coordinates: 44.861677, 82.117861 (approximate)
- Status: Operating
- Gross capacity: 300 MW (Units 1 & 2: 150 MW)
- Type: Supercritical
- In service: 2016 (Unit 1), 2017 (Unit 2)
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "携手农五师湖北能源拟投新疆能源项目", 新华网, 2012-06-14
- ↑ "兵团建设局批准五师湖北能源集团五星2X150MW热电联产建设项目规划选址", 新疆生产建设兵团建设局(环保局), 2013-12-04
- ↑ "新疆楚星能源五星2×150MW热电联产新建项目开工", 中国新疆网, 2012-08-24
- ↑ "边疆建设的湖北企业," 湖北省人民政府门户网站, 2015-09-28
- ↑ "湖北省经信委及鄂新两省电力公司考察五星热电联产项目," Hubei Energy, 2015-10-10
- ↑ "新疆五星热电联产项目实现双机投产运行," Hubei Energy Group, Jan 4, 2017