CR Xiwu Qi Wujianfang power station

From SourceWatch
Jump to navigation Jump to search
This article is part of the CoalSwarm coverage of China and coal
Sub-articles:

CR Xiwu Qi Wujianfang power station (华润电力锡林郭勒公司五间房电厂), also known as the Huarun Power Wujianfang Power Plant, is a 1,320-megawatt (MW) coal-fired power plant under development in Inner Mongolia Autonomous Region, China.

Location

The undated satellite below shows the location of the plant in Xiwuzhumuqin (Xiwu, or West Ujumqin) Banner, next to the Beijing Energy Wujianfang power station on the west side.

Loading map...

Background on Project

China Resources is currently planning to build a coal-fired power plant with a total planned capacity of 1,320 MW in Inner Mongolia Autonomous Region.[1][2]

Construction is planned for 2015 and operation in 2017.[3] Construction was approved in June 2015.[4][5]

Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

In 2016 China's National Energy Administration issued "scale control" (coal-fired capacity limits) on particular "sending out" locations that feed ultra-high voltage (UHV) long-distance power lines, including Inner Mongolia (Xilingong), Inner Mongolia (Ordos), Shaanxi, Ningxia, and Xinjiang.[6]

As of January 2017, the affected area includes this power station, which may be scaled down as a result. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

2017: Expansion postponed by government

In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[7]

CR Xiwu Qi Wujianfang power station Units 1-2 are among the postponed coal-burning units,[7] and also appeared on an updated list of postponements released in September 2017.[8]

For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.

March 2018: Construction continues on project

Satellite imagery for 44.572488, 116.739511 shows that construction continued on the project in the period July 2017 to March 2018.

Unit 1 was commissioned on November 11, 2019.[9]

Project Details

  • Sponsor: China Resources (70%), Beijing Energy Group (30%)
  • Location: Xiwuzhumuqin (Xiwu, or West Ujumqin) Banner, Xilingol (Xilinguole) Prefecture, Inner Mongolia Autonomous Region, China
  • Coordinates: 44.6022, 116.70 (exact)
  • Status: Operating (Unit 1), Construction (Unit 2)
  • Gross capacity: 1,320 MW (Units 1&2: 660 MW)
  • Type: Ultra-supercritical
  • Start year: 2019
  • Coal type: Waste coal
  • Coal source:
  • Source of financing:

Articles and resources

References

Related SourceWatch articles

External resources